TUPGW011 | Status of the PETRA IV project | 1404 |
|
||
Since 2016 DESY has been pursuing R&D towards upgrading its PETRA synchrotron light source to a fourth-generation machine, PETRA IV, which is expected to start operation in 2027. The conceptual design of a 6 GeV seven-bend-achromat-based lattice with an approx. 10pm emittance along with critically important technical systems has been completed. We will present the status of the project, the expected parameter space of the facility, and lattice design and beam dynamics issues for the main ring. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPGW011 | |
About • | paper received ※ 13 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPGW015 | Petra III Operation and Studies 2018 | 1419 |
|
||
At DESY the Synchrotron Light Source PETRA III offers scientists outstanding opportunities for experiments with hard X-rays of exceptionally high brilliance since 2009. This paper describes the operational schedule, the operational statistics and the most important beam studies done at PETRA III in 2018. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPGW015 | |
About • | paper received ※ 26 April 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |