Hardware Commissioning of the Renovated PIAVE Injector at INFN-LNL |
949 |
|
- G. Bisoffi, L. Bellan, J. Bermudez, E. Bissiato, D. Bortolato, F. Chiurlotto, M. Comunian, T. Contran, A. Facco, E. Fagotti, P. Francescon, A. Friso, A. Galatà, C.S. Gallo, M.G. Giacchini, M. Lollo, D. Martini, M.O. Miglioranza, P. Modanese, M. Montis, E. Munaron, G. Nigrelli, S. Pavinato, M. Pengo, A. Pisent, M. Poggi, L. Pranovi, M. Rossignoli, D. Scarpa
INFN/LNL, Legnaro (PD), Italy
- V. Andreev
ITEP, Moscow, Russia
- M.A. Bellato
INFN- Sez. di Padova, Padova, Italy
|
|
|
During 2018, the PIAVE superconducting linac injector at INFN-LNL, based on superconducting RFQs and two cryomodules with quarter wave resonators, underwent a renovation plan. This operation was strictly related to the one carried out on ALPI [1], which will become a post-accelerator for both stable and exotic beams in a near future. PIAVE Quarter Wave Resonator (QWR) cryomod-ules, in operation since 2006, were moved to ALPI to be used for the acceleration of both stable beams and future exotic beams delivered from the cyclotron target-ion-source station, after appropriate purification, charge breeding and pre-acceleration stages. In order to cope with the removal of the two QWR cryomodules in PIAVE, a newly designed 80 MHz room temperature buncher was designed, built and tested: the buncher is required so as to match the longitudinal phase space between PIAVE su-perconducting RFQs (SRFQ1 and SRFQ2) and ALPI. In the same period, substantial refurbishments on the ECR ion source platform were carried out, in particular on its infrastructure and safety equipment. A problem on an electronic component on SRFQ2, though quickly fixed, delayed beam commissioning of the PIAVE injector, which will start at the end of May 2019.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS042
|
|
About • |
paper received ※ 30 April 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPTS047 |
Radiation Measurement in the 1st Beam Commissioning Campaign of the LIPAc RFQ |
964 |
|
- K. Kondo, S. Kwon, K. Sakamoto, T. Shinya, M. Sugimoto
QST, Aomori, Japan
- L. Bellan, F. Grespan, F. Scantamburlo
INFN/LNL, Legnaro (PD), Italy
- P. Cara
IFMIF/EVEDA, Rokkasho, Japan
- H. Dzitko
F4E, Germany
- R. Heidinger
Fusion for Energy, Garching, Germany
- I. Podadera
CIEMAT, Madrid, Spain
|
|
|
The 1st proton beam acceleration of the Linear IFMIF Prototype Accelerator (LIPAc) through its novel RFQ was succeeded on 13th June 2018. Addition to plenty of beam diagnostics equipped in the beam line, we prepared some radiation detectors placed around the accelerator in order to acquire supplemental information of the beam, as an indirect measurement. In the first day of the beam injec-tion to the RFQ, the gamma-rays corresponding to certain excited states of Al of the low power beam dump were successfully detected by a LaBr3(Ce) scintillation detec-tor. Some neutrons, which would originate from the inter-action of protons with Cu somewhere, were also ob-served. These results proved that the beam was certainly accelerated up to about 2.5 MeV, and provided us a defin-itive confidence that the RFQ was working appropriately from the very beginning of the commissioning. Also, the comparison of the radiation yields with the RFQ trans-mission provided additional information on the beam energy distribution.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS047
|
|
About • |
paper received ※ 23 May 2019 paper accepted ※ 24 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPTS051 |
Lattice Design for 5MeV-125mA CW RFQ Operation in the LIPAc |
977 |
|
- Y. Shimosaki, A. Kasugai, K. Kondo, K. Sakamoto, M. Sugimoto
QST, Aomori, Japan
- L. Bellan, M. Comunian, E. Fagotti, A. Pisent
INFN/LNL, Legnaro (PD), Italy
- B. Brañas Lasala, C. Oliver, I. Podadera
CIEMAT, Madrid, Spain
- P. Cara
IFMIF/EVEDA, Rokkasho, Japan
- N. Chauvin
CEA-IRFU, Gif-sur-Yvette, France
- G. Duglue, H. Dzitko
F4E, Germany
- R. Heidinger
Fusion for Energy, Garching, Germany
- H. Kobayashi, K. Takayama
KEK, Ibaraki, Japan
|
|
|
The installation and commissioning of the LIPAc are ongoing under the Broader Approach agreement, which is the prototype accelerator of the IFMIF for proof of princi-ple and design. The deuteron beam will be accelerated by the RFQ linac from 100 keV to 5 MeV during the com-missioning phase-B and by the SRF linac up to 9 MeV during the phase-C. The commissioning phase-B+ will be implemented between phase-B and C to complete the engineering validation of the RFQ linac before installing the SRF linac. The lattice for the deuteron beam of 5 MeV and 125 mA at the commissioning phase-B+ was designed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS051
|
|
About • |
paper received ※ 15 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPGW030 |
Towards the First Beams from the ADIGE Injector for the SPES Project |
3647 |
|
- A. Galatà, L. Bellan, J. Bermudez, G. Bisoffi, D. Bortolato, M. Comunian, A. Conte, M. De Lazzari, P. Francescon, F. Gelain, D. Marcato, M.O. Miglioranza, M.F. Moisio, E. Munaron, S. Pavinato, D. Pedretti, A. Pisent, M. Roetta, C.R. Roncolato, M. Rossignoli, G. Savarese
INFN/LNL, Legnaro (PD), Italy
- V. Andreev
ITEP, Moscow, Russia
- J. Angot, D. Bondoux, T. Thuillier
LPSC, Grenoble Cedex, France
- M.A. Bellato
INFN- Sez. di Padova, Padova, Italy
|
|
|
The ADIGE (Acceleratore Di Ioni a Grande carica Esotici) injector of the SPES (Selective Production of Exotic Species) project is now in an advanced phase of installation. Its main components have been designed following particular needs of the project: first, an Electron Cyclotron Resonance (ECR)-based Charge Breeder (SPES-CB), to boost the charge states of the radioactive ions produced at SPES and allow their post-acceleration. Then, a stable 1+ source and a complete electrostatic beam line to characterize the SPES-CB. Finally, a unique Medium Resolution Mass Spectrometer (MRMS, R=1/1000), mounted on a high voltage platform downstream the SPES-CB, to clean the radioactive beam from the contaminants induced by the breeding stage. This contribution describes the status of the injector, in particular the installation of the platform housing the MRMS, the access and safety system adopted and the first beams to be extracted from the stable 1+ source.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THPGW030
|
|
About • |
paper received ※ 30 April 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPGW031 |
Hardware Commissioning of the Refurbished Alpi LINAC at INFN-LNL to Serve as Spes Exotic Beam Accelerator |
3650 |
|
- G. Bisoffi, L. Bellan, D. Bortolato, O. Carletto, F. Chiurlotto, M. Comunian, A. Conte, T. Contran, M. De Lazzari, E. Fagotti, A. Friso, M.G. Giacchini, M. Lollo, D. Marcato, M.O. Miglioranza, P. Modanese, M.F. Moisio, M. Montis, E. Munaron, G. Nigrelli, S. Pavinato, M. Pengo, A. Pisent, M. Poggi, L. Pranovi, C.R. Roncolato, M. Rossignoli, D. Scarpa
INFN/LNL, Legnaro (PD), Italy
- M.A. Bellato
INFN- Sez. di Padova, Padova, Italy
|
|
|
The ALPI linac at INFN-LNL was substantially refur-bished in 2018, especially in view of its use as secondary accelerator for exotic species in the framework of the SPES project. In particular: 10 magnetic triplets were replaced with higher gradient ones; two cryomodules with quarter wave resonator were moved from the PIAVE injector to ALPI, so as to make them available both for exotic and stable beams; the cryogenic plant was renovat-ed; the whole linac, its injector and its beam lines were eventually realigned via LASER tracking (LT). The ex-pected outcome of the refurbishment project is a larger beam transmission (crucial for the efficient transport of the unavoidably low current exotic beams) and improved overall reliability so as to further extend the lifetime of an already 25 years old machine. The hardware commission-ing of this new configuration will be reported.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THPGW031
|
|
About • |
paper received ※ 30 April 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|