Author: Bellafont, I.
Paper Title Page
TUPMP036 Results on the FCC-hh Beam Screen Sawtooth at the Kit Electron Storage Ring Kararesults on the Fcc-Hh Beam Screen Sawtooth at the Kit Electron Storage Ring Kara 1323
 
  • L.A. Gonzalez, V. Baglin, I. Bellafont, P. Chiggiato, C. Garion, R. Kersevan
    CERN, Geneva, Switzerland
  • I. Bellafont, F. Pérez
    ALBA-CELLS Synchrotron, Cerdanyola del Vallès, Spain
  • S. Casalbuoni, E. Huttel
    KIT, Eggenstein-Leopoldshafen, Germany
 
  Funding: * The European Circular Energy-Frontier Collider Study (EuroCirCol) project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant No 654305.
In the framework of the EuroCirCol collaboration (work package 4 "Cryogenic Beam Vacuum System"), the fabrication of the FCC-hh beam screen (BS) prototype has been carried out with the aim of testing it at room temperature on the Karlsruhe Institute of Technology (KIT) 2.5 GeV electron storage ring KARA (KArlsruhe Research Accelerator) light source. The BS prototype was tested on a beamline installed by the collaboration, named as BEam Screen TEstbench EXperiment (BESTEX). KARA has been chosen because its synchrotron radiation (SR) spectrum, photon flux and power match quite well the one foreseen for the 50+50 TeV FCC-hh proton collider. The BS prototype (2 m in length) was manufactured according to the base line design (BD) of the FCC-hh BS. It implements a saw-tooth profile designed to absorb the SR generated at the bending magnets. Also, a laser-ablated anti-electron cloud surface texturing [2] was applied at the BS inner walls. We present here the results obtained at BESTEX and the comparison of the results obtained during irradiation of the saw-tooth profile at different geometric configurations.
This activity has been carried out in the framework of the EuroCirCol* collaboration (work package 4 "Cryogenic Beam Vacuum System").
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP036  
About • paper received ※ 13 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP038 Summary of Modelling Studies on the Beam Induced Vacuum Effects in the FCC-hh 1331
 
  • I. Bellafont, R. Kersevan, L. Mether
    CERN, Meyrin, Switzerland
 
  Funding: The European Circular Energy-Frontier Collider Study (EuroCirCol) project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant No 654305.
EuroCirCol is a conceptual design study of a Future Circular Collider (FCC-hh) which aims to expand the current energy and luminosity frontiers that the LHC has established. The vacuum chamber of this 50 TeV, 100 km collider, will have to cope with unprecedented levels of synchrotron radiation power for proton colliders, dealing simultaneously with a tighter magnet aperture. Since the high radiation power and photon flux will release large amounts of gas into the system, the difficulty to keep a low level of residual gas density increases considerably compared with the LHC. This article presents a study of the beam induced vacuum effects for the FCC-hh novel conditions, the different phenomena which, owing to the presence of the beam, have an impact on the vacuum level of the accelerator. To achieve this, a novel beam screen has been proposed, featuring specific mitigating measures aimed at dealing with the beam induced effects. It is concluded that thanks to the new beam screen design, the vacuum level in the FCC-hh shall be adequate, allowing to reach the molecular density requirement of better than 1015 H2/m3 with baseline beam parameters within the first months of conditioning.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP038  
About • paper received ※ 10 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)