Title |
The Operation Status of CSNS Front End |
Authors |
- Y.W. An, Y.J. Lv, H.F. Ouyang, Y.C. Xiao
IHEP, Beijing, People’s Republic of China
- X. Cao, W. Chen, T. Huang, H. Li, S. Liu, K. Xue
IHEP CSNS, Guangdong Province, People’s Republic of China
|
Abstract |
China spallation neutron source (CSNS), as the China’s first 100kW beam power pulsed neutron source, its operation target beam power is now larger than 50kW. During the beam power upgrading process of CSNS to 50kW from 2018 to 2019, many improvements have been made for the front end of CSNS. In this paper, the commissioning and improvement of front end as well as the laboratory construction are introduced. The improvements mainly focus on solving the stability of ion source and the spark of Radio Frequncy quadrupole (RFQ) caused by the pre-chopped beam into RFQ.
|
Funding |
Work supported by National Natural Science Foundation of China(11875271) |
Paper |
download TUPTS038.PDF [0.668 MB / 3 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2019 |
Series |
International Particle Accelerator Conference (10th) |
Location |
Melbourne, Australia |
Date |
19-24 May 2019 |
Publisher |
JACoW Publishing, Geneva, Switzerland |
Editorial Board |
Mark Boland (UoM, Saskatoon, SK, Canada); Hitoshi Tanaka (KEK, Tsukuba, Japan); David Button (ANSTO, Kirrawee, NSW, Australia); Rohan Dowd (ANSTO, Kirrawee, NSW, Australia); Volker RW Schaa (GSI, Darmstadt, Germany); Eugene Tan (ANSTO, Kirrawee, NSW, Australia) |
Online ISBN |
978-3-95450-208-0 |
Received |
08 May 2019 |
Accepted |
21 May 2019 |
Issue Date |
21 June 2019 |
DOI |
doi:10.18429/JACoW-IPAC2019-TUPTS038 |
Pages |
2024-2026 |
Copyright |
Published by JACoW Publishing under the terms of the Creative Commons Attribution 3.0 International license. Any further distribution of this work must maintain attribution to the author(s), the published article's title, publisher, and DOI. |
|