Title |
DC Testing and Phase Resolved Partial Discharge Measurements of the New Trigger Transformers for the LHC Beam Dump Kickers |
Authors |
- T. Stadlbauer, A. Chmielinskapresenter, L. Ducimetière, D. Kontelis, T. Kramer, V. Senaj
CERN, Geneva, Switzerland
|
Abstract |
During LS2 the LHC beam dump kicker pulse generators will be subject to a substantial consolidation program. One major part is the replacement of the existing GTO stack trigger transformer by a new more performant one. The transformer is assembled, moulded and tested in-house. Part of the validation procedure are standard DC tests and subsequent discharge monitoring as well as newly introduced phase resolved partial discharge measurements. This paper briefly highlights the trigger transformer parameters and construction and outlines in detail the testing and partial discharge measurements. It concludes with a comparison and analysis of the results of the different measurement techniques.
|
Paper |
download THPRB079.PDF [0.483 MB / 3 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2019 |
Series |
International Particle Accelerator Conference (10th) |
Location |
Melbourne, Australia |
Date |
19-24 May 2019 |
Publisher |
JACoW Publishing, Geneva, Switzerland |
Editorial Board |
Mark Boland (UoM, Saskatoon, SK, Canada); Hitoshi Tanaka (KEK, Tsukuba, Japan); David Button (ANSTO, Kirrawee, NSW, Australia); Rohan Dowd (ANSTO, Kirrawee, NSW, Australia); Volker RW Schaa (GSI, Darmstadt, Germany); Eugene Tan (ANSTO, Kirrawee, NSW, Australia) |
Online ISBN |
978-3-95450-208-0 |
Received |
14 May 2019 |
Accepted |
23 May 2019 |
Issue Date |
21 June 2019 |
DOI |
doi:10.18429/JACoW-IPAC2019-THPRB079 |
Pages |
3998-4000 |
Copyright |
Published by JACoW Publishing under the terms of the Creative Commons Attribution 3.0 International license. Any further distribution of this work must maintain attribution to the author(s), the published article's title, publisher, and DOI. |
|