The LCLS-II project calls for cryomodule production and testing at both Fermilab and JLab. Due to low beam loading and high cavity quality factor, the designed peak detuning specification is 10 Hz. Initial testing showed peak detuning up to 150 Hz with a complex and varying time-structure, showing both fast (1-2 second) and slow (1-2 hour) drifts in amplitude and spectrum. Extensive warm and cold testing showed Thermoacoustic Oscillations in the cryogenic valves were the primary source of the microphonics. This was mitigated by valve wipers and valve re-plumbing, resulting in a greatly improved cavity detuning environment. Additional modifications were made to the cavity mechanical supports and Fermilab test stand to improve detuning performance. These modifications and testing results will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML001  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPML003 Precision Q0 Measurement of an SRF Cavity with a Digital RF Techniques 2674
 
  • J.P. Holzbauer, B.M. Hanna, Y.M. Pischalnikov, W. Schappert, D.A. Sergatskov, A.I. Sukhanov
    Fermilab, Batavia, Illinois, USA
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.
Direct measurement of the quality factor of SRF cavity using traditional RF techniques is essential for cavity production and development. Systematic effects of the measurement can contribute significant amounts of error to these measurements if not accounted for. This paper will present measurements taken at Fermilab using a digital RF system to characterize and correct for these systematic effects and directly measure the quality factor versus gradient curve for a single spoke resonator in the Spoke Test Cryostat at Fermilab. These measurements will be compared to traditional calorimetric measurements, and a discussion of improving/extending these techniques to other testing situations will be included.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPML004 Production Tuner Testing for LCLS-II Cryomodule Production 2678
 
  • J.P. Holzbauer, Y.M. Pischalnikov, W. Schappert, J.C. Yun
    Fermilab, Batavia, Illinois, USA
  • C. Contreras-Martinez
    FRIB, East Lansing, USA
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.
LCLS-II 1.3 GHz cryomodule production is well underway at Fermilab. Several dozen cavity/tuner systems have been tested, including tuning to 1.3 GHz, cold landing frequency, range/sensitivity of the slow tuner, and range/sensitivity of the fast tuner. All this testing information as well as lessons learned from tuner installation will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML004  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPML007 Active Microphonics Compensation for LCLS-II 2687
 
  • J.P. Holzbauer, B.E. Chase, J. Einstein-Curtis, Y.M. Pischalnikov, W. Schappert
    Fermilab, Batavia, Illinois, USA
  • L.R. Doolittle, C. Serrano
    LBNL, Berkeley, California, USA
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.
Testing of early LCLS-II cryomodules showed microphonics-induced detuning levels well above specification. As part of a risk-mitigation effort, a collaboration was formed between SLAC, LBNL, and Fermilab to develop and implement active microphonics compensation into the LCLS-II LLRF system. Compensation was first demonstrated using a Fermilab FPGA-based development system compensating on single cavities, then with the LCLS-II LLRF system on single and multiple cavities simultaneously. The primary technique used for this effort is a bank of narrowband filter set using the piezo-to-detuning transfer function. Compensation automation, optimization, and stability studies were done. Details of the techniques used, firmware/software implementation, and results of these studies will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML007  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPML008 Tuner Testing of a Dressed 3.9 GHz Cavity for LCLS-II at Fermilab 2690
 
  • J.P. Holzbauer, S. Aderhold, T.N. Khabiboulline, Y.M. Pischalnikov, W. Schappert, J.C. Yun
    Fermilab, Batavia, Illinois, USA
  • C. Contreras-Martinez
    FRIB, East Lansing, USA
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.
Fermilab is responsible for the design of the 3.9 GHz cryomodule for LCLS-II. Integrated acceptance testing of a dressed 3.9 GHz cavity for the LCLS-II project has been done at the Fermilab Horizontal Test Stand. This test included a slim blade tuner (based on INFN & XFEL designs) with integrated piezoelectric fast/fine tuner. This paper will present results of the mechanical setup, cold testing, and cold function of this tuner including fast and slow tuner range, sensitivity, and hysteresis.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML008  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THYGBE3 RF Controls for High-Q Cavities for the LCLS-II 2929
 
  • C. Serrano, K.S. Campbell, L.R. Doolittle, G. Huang, A. Ratti
    LBNL, Berkeley, California, USA
  • R. Bachimanchi, C. Hovater
    JLab, Newport News, Virginia, USA
  • A.L. Benwell, M. Boyes, G.W. Brown, D. Cha, G. Dalit, J.A. Diaz Cruz, J. Jones, R.S. Kelly, A. McCollough
    SLAC, Menlo Park, California, USA
  • B.E. Chase, E. Cullerton, J. Einstein-Curtis, J.P. Holzbauer, D.W. Klepec, Y.M. Pischalnikov, W. Schappert
    Fermilab, Batavia, Illinois, USA
  • L.R. Dalesio, M.A. Davidsaver
    Osprey DCS LLC, Ocean City, USA
 
  Funding: This work was supported by the LCLS-II Project and the U.S. Department of Energy, Contract n. DE-AC02-76SF00515.
The SLAC National Accelerator Laboratory is building LCLS-II, a new 4 GeV CW superconducting (SCRF) Linac as a major upgrade of the existing LCLS. The LCLS-II Low-Level Radio Frequency (LLRF) collaboration is a multi-lab effort within the Department of Energy (DOE) accelerator complex. The necessity of high longitudinal beam stability of LCLS-II imposes tight amplitude and phase stability requirements on the LLRF system (up to 0.01% in amplitude and 0.01° in phase RMS). This is the first time such requirements are expected of superconducting cavities operating in continuous-wave (CW) mode. Initial measurements on the Cryomodule test stands at partner labs have shown that the early production units are able to meet the extrapolated hardware requirements to achieve such levels of performance. A large effort is currently underway for system integration, Experimental Physics and Industrial Control System (EPICS) controls, transfer of knowledge from the partner labs to SLAC and the production and testing of 76 racks of LLRF equipment.
 
slides icon Slides THYGBE3 [14.383 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THYGBE3  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)