Commissioning Status of SuperKEKB Main Ring Magnet System |
2933 |
|
- M. Masuzawa, T. Adachi, K. Egawa, T. Kawamoto, S. Nakamura, Y. Ohsawa, T. Oki, R. Sugahara, R. Ueki
KEK, Ibaraki, Japan
|
|
|
SuperKEKB is an electron-positron collider, which aims for the very high peak luminosity of 8x1035 cm-2s-1 , 40 times higher than that of KEKB. The SuperKEKB Main Ring (MR) system is very large, consisting of more than 1700 water-cooled normal-conducting magnets and about 900 air-cooled normal-conducting magnets. More than 400 magnets and power supplies were newly fabricated, tested and installed for SuperKEKB Phase I beam operation. The MR magnet system worked well, which contributed greatly to the smooth start-up of the MR. Commissioning status of the MR magnet system during SuperKEKB Phase I operation will be reported. Some problems resulting in beam abort will also be reported.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-WEPIK010
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|