TUPVA128 |
Performance of the CERN Injector Complex and Transmission Studies into the LHC during the Second Proton-Lead Run |
2395 |
|
- R. Alemany-Fernández, S.C.P. Albright, M.E. Angoletta, J. Axensalva, W. Bartmann, H. Bartosik, P. Baudrenghien, G. Bellodi, A. Blas, T. Bohl, E. Carlier, S. Cettour-Cave, K. Cornelis, H. Damerau, A. Findlay, S.S. Gilardoni, S. Hancock, A. Huschauer, M.A. Jebramcik, S. Jensen, J.M. Jowett, V. Kain, D. Küchler, A.M. Lombardi, D. Manglunki, T. Mertens, M. O'Neil, S. Pasinelli, Á. Saá Hernández, M. Schaumann, R. Scrivens, R. Steerenberg, H. Timko, V. Toivanen, G. Tranquille, F.M. Velotti, F.J.C. Wenander, J. Wenninger
CERN, Geneva, Switzerland
|
|
|
The LHC performance during the proton-lead run in 2016 fully relied on a permanent monitoring and systematic improvement of the beam quality in all the injectors. The beam production and characteristics are explained in this paper, together with the improvements realized during the run from the source up to the flat top of the LHC. Transmission studies from one accelerator to the next as well as beam quality evolution studies during the cycle at each accelerator, have been carried out and are summarized in this paper. In 2016, the LHC had to deliver the beams to the experiments at two different energies, 4 Z TeV and 6.5 Z TeV. The properties of the beams at these two energies are also presented
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA128
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPVA034 |
ELENA - From Installation to Commissioning |
3327 |
|
- T. Eriksson, W. Bartmann, P. Belochitskii, L. Bojtár, H. Breuker, F. Butin, C. Carli, B. Dupuy, P. Freyermuth, L.V. Jørgensen, B. Lefort, J. Mertens, R. Ostojić, S. Pasinelli, G. Tranquille
CERN, Geneva, Switzerland
- W. Oelert
Johannes Gutenberg University Mainz, Institut für Physik, Mainz, Germany
|
|
|
ELENA (Extra Low ENergy Antiproton ring) is an upgrade project at the CERN AD (Antiproton Decelerator). The smaller ELENA ring will further decelerate 5.3 MeV antiprotons from the AD ring down to 100 keV using electron cooling to obtain good deceleration efficiency and dense beams. An increase of up to two orders of magnitude in trapping efficiency is expected at the AD experiments. This paper will report on the current status of ELENA where beam commissioning of the ring is now taking place. Phase one of the project installation has been completed with ring and injection lines in place, while phase two will finalize the project with installation of 100 keV transfer lines connecting the experiments to ELENA and is planned to take place in 2019/2020.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA034
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|