MOPAB120 |
Beam Instrumentation for the CERN LINAC4 and PSB Half Sector Test |
408 |
|
- F. Roncarolo, J.C. Allica Santamaria, M. Bozzolan, C. Bracco, S. Burger, G.J. Focker, G. Guidoboni, L.K. Jensen, B. Mikulec, A. Navarro Fernandez, U. Raich, J.B. Ruiz, L. Søby, J. Tan, W. Viganò, C. Vuitton, C. Zamantzas
CERN, Geneva, Switzerland
- T. Hofmann
Royal Holloway, University of London, Surrey, United Kingdom
|
|
|
The construction, installation and initial commissioning of CERN's LINAC4 was completed in 2016 with H− ions successfully accelerated to its top energy of 160 MeV. The accelerator is equipped with a large number of beam diagnostic systems that are essential to monitor, control and optimize the beam parameters. A general overview of the installed systems and their functional specifications will be followed by a summary of the most relevant results. This includes transverse profile monitors (wire scanners, wire grids and a laser profile monitor), beam position and phase monitors (whose ToF measurements were essential for adjusting RF cavity parameters), beam loss monitors, beam current transformers and longitudinal beam shape monitors. This contribution will also cover the beam instrumentation for the so-called PSB Half Sector Test, which has been temporarily installed in the LINAC4 transfer line to study H− stripping efficiency. At this facility it was possible to test the new H0/H− beam current monitor, designed to monitor the stripping efficiency and an essential element of the beam interlock system when the LINAC4 is connected to the PSB in 2019.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPAB120
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPIK047 |
Commissioning and Results of the Half-Sector Test Installation with 160 MeV H− beam from Linac4 |
619 |
|
- B. Mikulec, D. Aguglia, J.C. Allica Santamaria, C. Baud, C. Bracco, S. Burger, G. Guidoboni, L.O. Jorat, C. Martin, A. Navarro Fernandez, R. Noulibos, F. Roncarolo, J.L. Sanchez Alvarez, J. Tan, T. Todorcevic, P. Van Trappen, W.J.M. Weterings, C. Zamantzas
CERN, Geneva, Switzerland
|
|
|
During the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will undergo a profound upgrade in the framework of the LHC Injector Upgrade (LIU) project involving also the connection to the new Linac4 injector. The 160 MeV Linac4 H' injection entails a complete replacement of the PSB injection section, including a stripping foil system, injection chicane, an H0/H' dump and novel beam instrumentation. The equivalent of half of this new injection chicane was temporarily installed in the Linac4 transfer line to evaluate the performance of the equipment and prepare controls, interlocks and applications for the connection. Outcomes of this so-called Half-Sector Test (HST) are presented in this paper.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPIK047
|
|