Author: Oliwa, K.
Paper Title Page
THOAA3 Installation and First Commissioning of the LLRF System for the European XFEL 3638
 
  • J. Branlard, G. Ayvazyan, V. Ayvazyan, Ł. Butkowski, M. Fenner, M.K. Grecki, M. Hierholzer, M. Hoffmann, M. Killenberg, D. Kostin, D. Kühn, F. Ludwig, D.R. Makowski, U. Mavrič, M. Omet, S. Pfeiffer, H. Pryschelski, K.P. Przygoda, A.T. Rosner, R. Rybaniec, H. Schlarb, Ch. Schmidt, N. Shehzad, B. Szczepanski, G. Varghese, H.C. Weddig, R. Wedel, M. Wiencek, B.Y. Yang
    DESY, Hamburg, Germany
  • W. Cichalewski, F. Makowski, A. Mielczarek, P. Perek
    TUL-DMCS, Łódź, Poland
  • K. Czuba, P.K. Jatczak, T.P. Leśniak, K. Oliwa, D. Sikora, M. Urbański, W. Wierba
    Warsaw University of Technology, Institute of Electronic Systems, Warsaw, Poland
  • A.S. Nawaz
    TUHH, Hamburg, Germany
 
  The installation phase of the European X-ray free laser electron laser (XFEL) is finished, leaving place for its commissioning phase. This contribution summarizes the low-level radio frequency (LLRF) installation steps, illustrated with examples of its challenges and how they were addressed. The commissioning phase is also presented, with a special emphasis on the effort placed into developing LLRF automation tools to support the commissioning of such a large scale accelerator. The first results of the LLRF commissioning of the XFEL injector and first RF stations in the main linac are also given.  
slides icon Slides THOAA3 [15.800 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-THOAA3  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)