Author: Ohsawa, Y.
Paper Title Page
WEPIK010 Commissioning Status of SuperKEKB Main Ring Magnet System 2933
 
  • M. Masuzawa, T. Adachi, K. Egawa, T. Kawamoto, S. Nakamura, Y. Ohsawa, T. Oki, R. Sugahara, R. Ueki
    KEK, Ibaraki, Japan
 
  SuperKEKB is an electron-positron collider, which aims for the very high peak luminosity of 8x1035 cm-2s-1 , 40 times higher than that of KEKB. The SuperKEKB Main Ring (MR) system is very large, consisting of more than 1700 water-cooled normal-conducting magnets and about 900 air-cooled normal-conducting magnets. More than 400 magnets and power supplies were newly fabricated, tested and installed for SuperKEKB Phase I beam operation. The MR magnet system worked well, which contributed greatly to the smooth start-up of the MR. Commissioning status of the MR magnet system during SuperKEKB Phase I operation will be reported. Some problems resulting in beam abort will also be reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPIK010  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)