Author: Ohnishi, Y.
Paper Title Page
MOPIK076 Optimization of Dynamic Aperture with Constraints on Linear Chromaticity 705
 
  • H. Sugimoto, H. Koiso, A. Morita, Y. Ohnishi, K. Oide, D. Zhou
    KEK, Ibaraki, Japan
 
  This paper presents numerical technique to optimize dynamic aperture with constraints on linear chromaticity of optical functions. By solving a set of linear equations at each iteration step of dynamic aperture optimization, the linear chromaticity is kept unchanged. The variable range of tuning knobs is taken into account in order to make the technique applicable to practical use. Numerical simulations assuming the SuperKEKB design lattice are performed, and it is demonstrated that the dynamic aperture obtained with the presented scheme is almost comparable to that without constraints. Luminosity simulations assuming weak-strong model show that the constraints lead to improvements of luminosity performance.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPIK076  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB004 Progress of 7-GeV SuperKEKB Injector Linac Upgrade and Commissioning 1300
 
  • K. Furukawa, M. Akemoto, D.A. Arakawa, Y. Arakida, H. Ego, A. Enomoto, Y. Enomoto, S. Fukuda, Y. Funahashi, T. Higo, H. Honma, N. Iida, M. Ikeda, H. Kaji, K. Kakihara, T. Kamitani, H. Katagiri, M. Kawamura, M. Kurashina, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, T. Miura, F. Miyahara, H. Nakajima, K. Nakao, T. Natsui, M. Nishida, Y. Ogawa, Y. Ohnishi, S. Ohsawa, F. Qiu, I. Satake, D. Satoh, M. Satoh, Y. Seimiya, A. Shirakawa, H. Sugimoto, H. Sugimura, T. Suwada, T. Takatomi, T. Takenaka, M. Tanaka, N. Toge, Y. Yano, K. Yokoyama, M. Yoshida, R. Zhang, X. Zhou
    KEK, Ibaraki, Japan
 
  KEK injector linac has delivered electrons and positrons for particle physics and photon science experiments for more than 30 years. It is being upgraded for the SuperKEKB project, which aims at a 40-fold increase in luminosity over the previous project KEKB, in order to increase our understanding of new physics beyond the standard model of elementary particle physics. SuperKEKB asymmetric electron and positron collider with its extremely high luminosity requires a high current, low emittance and low energy spread injection beam from the injector. Electron beams will be generated by a new type of RF gun, that will provide a much higher beam current to correspond to a large stored beam current and a short lifetime in the ring. The positron source is another major challenge that enhances the positron bunch intensity from 1 to 4 nC by increasing the positron capture efficiency, and the positron beam emittance is reduced from 2000 micron to 20 micron in the vertical plane by introducing a damping ring, followed by the bunch compressor and energy compressor. The recent status of the upgrade and beam commissioning is reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPAB004  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPIK006 Cancellation of the Leak Field from Lambertson Septum for the Beam Abort System in the SuperKEKB 2918
 
  • N. Iida, M. Kikuchi, K. Kodama, T. Mimashi, T. Mori, Y. Ohnishi, K. Oide, H. Sugimoto, M. Tawada
    KEK, Ibaraki, Japan
 
  The first commissioning of SuperKEKB, Phase 1, was performed from February 2016 for five months. A Lambertson septum magnet is utilized to vertically extract the aborted beam, kicked by the horizontal abort kickers upstream into a beam dump. This magnet creates unexpected leak field with a non-negligible skew quadrupole component to the stored beam. Two kinds of skew quadrupole magnets are installed on both sides of the Lambertson septum. One is additional skew windings on the sextupole magnet, and the other is a skew quadrupole magnet with permanent magnets. This paper will report that the cancellations of the leak fields was successful and useful for optics correction.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPIK006  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPIK007 Optics Design and Observation for the Beam Abort System in SuperKEKB HER 2922
 
  • N. Iida, K. Egawa, Y. Enomoto, Y. Funakoshi, M. Kikuchi, T. Mimashi, Y. Ohnishi, K. Oide, Y. Suetsugu
    KEK, Ibaraki, Japan
 
  In the first commissioning of SuperKEKB, which is 'Phase 1', the new abort system is tested in the High Energy Ring (HER). There is a risk that aborted beams with low emittance and high current may destroy the window for extraction from beam pipe. In order to enlarge the aborted beam at the window, quadrupole field is applied only for the aborted beam. In the Low Energy Ring (LER), quadrupole pulsed magnets will be installed to enlarge the aborted beam, and in the HER, a pair of identical sextupole magnets is installed between the abort kickers and the extraction window. These sextrupole magnets are connected by I or 'I transformation to cancel the geometrical nonlinearity for the stored beam in the ring. This paper will report the optics design for the abort system of the HER as well as the observation of the aborted beam.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPIK007  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPVA055 Pre Orbit Correction Based on Tunnel Level Measurement in SuperKEKB 3385
 
  • A. Morita, H. Koiso, Y. Ohnishi, H. Sugimoto
    KEK, Ibaraki, Japan
 
  The SuperKEKB accelerator tunnel has about 30mm displacement in the vertical direction. From the result of optics correction simulation with the tunnel displacement, it was decided that the beamline components align against the smoothed line of the measured tunnel level in order to save the alignment cost and time. In order to compensate the large tunnel displacement, the pre orbit correction based on the tunnel level measurement is applied at the beginning of the phase-1 commissioning, and the beam circulation is achieved with the small number of magnet adjustments. We report the result of the pre orbit correction.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA055  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPVA012 Transverse Impedance Measurement in SuperKEKB 4442
 
  • N. Kuroo
    UTTAC, Tsukuba, Ibaraki, Japan
  • T. Ishibashi, T. Mimashi, K. Ohmi, Y. Ohnishi, K. Shibata, Y. Suetsugu, S. Terui, M. Tobiyama, D. Zhou
    KEK, Ibaraki, Japan
 
  In KEK(Japan), SuperKEKB project is progressing toward upgrade. This project aims improvement luminosity (8×1035 cm-2s- 1) which is 40 times of the performance of the KEKB accelerator. In Phase 1 of this project, a performance test as storage ring was carried out. Understanding of ring Impedance/wake is an important subject in phase I. Measurement of Head Tail Damping using Turn by Turn monitor was performed to evaluate impedance/wake. Betatron motion is excited by kicker and its damping is measured for several parameters sets of bunch current and chromaticity in both HER and LER. The wake field was calculated from the decrement of betatron amplitude. We present the wake field which is cross-checked with tune shift based on the current dependence.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-THPVA012  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)