THPAB114 Operation of LLRF Control Systems in SuperKEKB Phase-1 Commissioning 3986
 
  • T. Kobayashi, K. Akai, K. Ebihara, A. Kabe, K. Nakanishi, M. Nishiwaki, J.-I. Odagiri, S.I. Yoshimoto
    KEK, Ibaraki, Japan
  • K. Hirosawa
    Sokendai, Ibaraki, Japan
 
  First beam commissioning of SuperKEKB (Phase-1), which had started in February 2016 and continued until the end of June, has been successfully accomplished. Target beam current for Phase-1 needed for sufficient vacuum scrubbing was achieved in both 7-GeV electron and 4-GeV positron rings. This presentation summarize the operation results related to low level RF (LLRF) control issues during the Phase-1 commissioning, including the system tuning, the coupled bunch instability and the bunch gap transient effect. RF system of SuperKEKB consists of about thirty klystron stations in both rings. Newly developed LLRF control system, which is composed of recent digital technique, is applied to the nine stations among the thirty for Phase-1. The RF reference signal distribution system has been also upgraded for SuperKEKB. These new systems worked well without serious problem and they contributed to smooth progress of the commissioning. The old existing systems, which had been used in the KEKB operation, were still reused for the most stations, and they also worked as soundly as performed in the KEKB operation.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-THPAB114  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)