Paper |
Title |
Page |
MOPAB031 |
Orbit Measurements in the BESSY II Booster in Preparation for Quasi-Low-Alpha Operation |
146 |
|
- T. Atkinson, E. Motuk, M. Ries, M. Ulrich
HZB, Berlin, Germany
|
|
|
Diagnostic refurbishments are ongoing in the booster synchrotron in preparation for the near future Variable pulse Storage Ring (VSR) project at BESSY II. Essential orbit measurements have been re-installed after almost two decades of latency. This diagnostic will help assess the effectiveness of the possible upgrade scenarios such as quasi-low-alpha operation and extraction optimization. The contribution presents the preliminary results of the continual global upgrade of the injector systems.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPAB031
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|