Author: Motuk, E.
Paper Title Page
MOPAB031 Orbit Measurements in the BESSY II Booster in Preparation for Quasi-Low-Alpha Operation 146
 
  • T. Atkinson, E. Motuk, M. Ries, M. Ulrich
    HZB, Berlin, Germany
 
  Diagnostic refurbishments are ongoing in the booster synchrotron in preparation for the near future Variable pulse Storage Ring (VSR) project at BESSY II. Essential orbit measurements have been re-installed after almost two decades of latency. This diagnostic will help assess the effectiveness of the possible upgrade scenarios such as quasi-low-alpha operation and extraction optimization. The contribution presents the preliminary results of the continual global upgrade of the injector systems.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPAB031  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)