Author: Medeiros-Romao, L.     [Medeiros Romão, L.]
Paper Title Page
TUPVA062 Construction of the MYRRHA Injector 2221
 
  • D. Mäder, H. Höltermann, H. Hähnel, D. Koser, K. Kümpel, U. Ratzinger, W. Schweizer
    BEVATECH, Frankfurt, Germany
  • C. Angulo, J. Belmans, L. Medeiros Romão, D. Vandeplassche
    Studiecentrum voor Kernenergie - Centre d'Étude de l'énergie Nucléaire (SCK•CEN), Mol, Belgium
  • M. Busch, H. Podlech
    IAP, Frankfurt am Main, Germany
 
  A collaboration of SCK•CEN, IAP and BEVATECH GmbH is currently constructing the room temperature CH section of the 16.6 MeV CW proton injector for the MYRRHA project. The elaboration of all the construction readiness files for the construction of the accelerating cavities of the first CH section (1.5 to 5.9 MeV) is ongoing. In parallel, the planning, development and fabrication of all further components of this accelerator section is in progress, while the full study for the remaining section is under preparation. This contribution is documenting the most recent status.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA062  