Author: Masi, A.
Paper Title Page
MOPAB006 Design and Prototyping of New CERN Collimators in the Framework of the LHC Injector Upgrade (LIU) Project and the High-Luminosity (HL-LHC) Project 80
 
  • F.-X. Nuiry, O. Aberle, M. Bergeret, A. Bertarelli, N. Biancacci, R. Bruce, M. Calviani, F. Carra, A. Dallocchio, L. Gentini, S.S. Gilardoni, R. Illan Fiastre, I. Lamas Garcia, A. Masi, A. Perillo-Marcone, S. Pianese, S. Redaelli, E. Rigutto, B. Salvant
    CERN, Geneva, Switzerland
 
  In the framework of the Large Hadron Collider (LHC) Injectors Upgrade (LIU) and the High-Luminosity LHC (HL-LHC) Projects at CERN (European Organization for Nuclear Research, in Geneva, Switzerland), collimators in the Super Proton Synchrotron (SPS) to LHC transfer lines as well as ring collimators in the LHC will undergo important upgrades in the forthcoming years, mainly focused during the Long Shutdown 2 foreseen during 2019-2020. This contribution will detail the current design of the TCDIL collimators with a particular emphasis on the engineering developments performed on the collimator jaws, aiming at getting a stringent flatness while consid-ering also the integration of thermal shock resistant materials. The prototyping phase done at CERN will be also described. The activities ongoing to prepare the series production for other LHC collimator types (TCPPM, TCSPM, TCTPM, TCLD) will be presented, describing the role that each of these collimators play on the HL-LHC Project. A focus on the series production processes, the manufacturing and assembly technologies involved and the quality and performance assurance tests will be given.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPAB006  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPAB007 Status of Crystal Collimation Studies at the LHC 84
SUSPSIK008   use link to see paper's listing under its alternate paper code  
 
  • R. Rossi, O. Aberle, O.Ø. Andreassen, M.E.J. Butcher, C.A. Dionisio Barreto, I. Lamas Garcia, A. Masi, D. Mirarchi, S. Montesano, S. Redaelli, A. Rijllart, W. Scandale, P. Serrano Galvez, G. Valentino
    CERN, Geneva, Switzerland
  • F. Galluccio
    INFN-Napoli, Napoli, Italy
 
  Crystal collimation is a technique that relies on highly pure bent crystals to coherently deflect beam particles - through the channeling mechanisms - onto dedicated absorbers. Standard multi-stage collimation systems for hadron beams use amorphous materials as primary collimators and might be limited by nuclear interactions and ion fragmentation that are strongly suppressed in crystals. A crystal collimation setup was installed in the betatron cleaning insertion of the Large Hadron Collider (LHC) to demonstrate with LHC beams the feasibility of this concept and to compare its performance with that of the present system. Channeling was observed for the first time with 6.5 TeV beam and and plans for further crystal collimation beam tests at the LHC are discussed. Results of these first beam tests are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPAB007  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPVA109 Design of the New PS Internal Dumps, in the Framework of the LHC Injector Upgrade (LIU) Project 3521
 
  • G. Romagnoli, J.A. Briz Monago, M. Calviani, J.J. Esala, E. Grenier-Boley, A. Masi, F.-X. Nuiry, A. Perillo-Marcone, T. Polzin, V. Vlachoudis
    CERN, Geneva, Switzerland
 
  For the LHC injectors upgrade (LIU) at CERN, the two PS (Proton Synchrotron) dumps will be redesigned and upgraded for the new high intensity beams. The EN-STI group is in charge of the design and installation of the new dumps, foreseen for the next CERN's Long Shutdown in 2019-2020. As internal dumps, the PS dumps have been installed in 1975 directly in the PS vacuum ring between the main bending magnets and they are operating since then. The dumps enter the beam line when requested by beam operation, with a 6 kg Cu block moved quickly with a spring-based mechanism. This Cu block is not expected to survive the impact of the future beams. A new design is presented for the dump core based on FLUKA-ANSYS coupled simulations. The dumps should work with any PS beam foreseen within LIU, be water cooled in ultra-high vacuum medium, and enter the beam chamber in less than 250 ms. The dump should be used 200000 times per year, with a lifetime of 20 years, with almost zero maintenance. The new challenging design is based on an oscillating thin blade shaving turn after turn the circulating beam. The material considered for the blade are Cu, Ti or CuCrZr with embedded cooling channels.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA109  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)