Author: Marten, P.J.
Paper Title Page
THPIK112 Progress With the Diamond Light Source RF Upgrade 4358
 
  • C. Christou, A.G. Day, M.J. Duignan, P. Gu, N.P. Hammond, P.J. Marten, S.A. Pande, D. Spink
    DLS, Oxfordshire, United Kingdom
 
  Failure of a superconducting cavity in the Diamond storage ring can lead to extended down-time because of the time required to remove the module from the ring, the inability to access the cavity without removal from the cryostat and the long time to repair of the module. To reduce the risk to storage ring operation, normal conducting cavities are being installed to support operation of the superconducting cavities. Two cavities will be introduced in 2017 and work is progressing with RF amplifiers, transmission lines and low-level RF as well as storage ring engineering and controls. A summary of progress so far is presented and the plan for installation and further RF upgrades is outlined.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-THPIK112  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)