Author: Marhauser, F.
Paper Title Page
MOPVA128 RF Performance of Nitrogen-Doped Production SRF Cavities for LCLS-II 1156
 
  • D. Gonnella, A. Burrill, M.C. Ross
    SLAC, Menlo Park, California, USA
  • S. Aderhold, A. Grassellino, C.J. Grimm, T.N. Khabiboulline, O.S. Melnychuk, S. Posen, D.A. Sergatskov
    Fermilab, Batavia, Illinois, USA
  • E. Daly, G.K. Davis, F. Marhauser, K.M. Wilson
    JLab, Newport News, Virginia, USA
 
  Funding: DOE and the LCLS-II Project
The Linac Coherent Light Source II (LCLS-II) requires 280 9-cell superconducting RF cavities for operation in continuous wave mode. Two vendors have previously been selected to produce the cavities, Research Instruments GmbH and Ettore Zanon S.p.a. Here we present results from manufacturing and cavity preparation for the cavities constructed at these two vendors for LCLS-II. We show how the cavity preparation method has been changed mid-production in order to improve flux expulsion in the cavities and maintain high performance in realistic magnetic field environments (~5 mG). Additionally, we show that the nitrogen-doping process has been carried out successfully and repeatedly on over 70 cavities.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA128  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPVA131 Status of the LCLS-II Accelerating Cavity Production 1164
 
  • F. Marhauser, E. Daly, J.A. Fitzpatrick, A.D. Palczewski, J.P. Preble, K.M. Wilson
    JLab, Newport News, Virginia, USA
  • A. Burrill, D. Gonnella
    SLAC, Menlo Park, California, USA
  • C.J. Grimm
    Fermilab, Batavia, Illinois, USA
 
  Funding: Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177 with supplemental funding from the LCLS-II Project U.S. DOE Contract No. DE-AC02-76SF00515.
Cavity serial production for the LCLS-II 4 GeV CM SRF linac has started. A quantity of 266 accelerating cavities has been ordered from two industrial vendors. Jefferson Laboratory leads the cavity procurement activities for the project and has successfully transferred the Nitrogen-Doping process to the industrial partners in the initial phase, which is now being applied for the production cavities. We report on the results from vendor qualification and the status of the cavity production for LCLS-II.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA131  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPIK124 Using Conductive Nanoparticles to Reduce the Surface Charging of Ceramics 4392
 
  • M.L. Neubauer, A. Dudas
    Muons, Inc, Illinois, USA
  • F. Marhauser
    JLab, Newport News, Virginia, USA
 
  Beam pipe ceramics used for various purposes suffer from the problem of surface charging in the presence of an electron beam. A novel technique has been proposed for a method for reducing the charging effects by filling nano sized pores in the ceramic with a conductive medium. Pores in ceramics can be formed in a chain with varying depths depending on sintering temperatures and methods for creating the pores. In the pre-formed condition of these novel ceramics, a nanoparticle slurry is infused by capillary action into the ceramic and fired at temperatures and atmospheres to stabilize the conductive medium inside the ceramic. The microwave characteristics of these ceramics will be investigated in a Phase I program with the design of a complete beam pipe lossy ceramic in a Phase II.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-THPIK124  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)