Author: Lunin, A.
Paper Title Page
MOPVA113 RF Quality Control of SRF Cavities for LCLS-II Cryo-Modules 1108
 
  • M.H. Awida, P. Berrutti, T.N. Khabiboulline, A. Lunin, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
 
  Funding: *Operated by Fermi Research Alliance, LLC, under Contract DE-AC02-07CH11359 with the U.S. DOE
LCLS-II project is gearing up to build 36 cryo-modules of the 1.3 GHz TESLA style cavities. Half of those cryomodules are being built at Fermilab, while JLAB is carrying the production of the other half. In this paper, we present the process of quality controlling the RF performance of cavities until they are qualified for the final string assembly at Fermilab. The RF quality control process includes monitoring the frequency spectrum of each cavity and tuning/adjusting of the notch frequencies before testing at the Vertical Test Stand (VTS). Measured data during income QC is presented and in addition we show the notch frequencies before and after testing at the VTS. Moreover, we report some of the RF measurements taken while the cavity is cooled down to 2K temperature.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA113  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPVA132 Production of Copper-Plated Beamline Bellows and Spools for LCLS-II 1167
 
  • K.M. Wilson, B. Carpenter, E. Daly, N.A. Huque, T. Peshehonoff
    JLab, Newport News, Virginia, USA
  • T.T. Arkan, A. Lunin, K.S. Premo
    Fermilab, Batavia, Illinois, USA
 
  Funding: This work was supported by the LCLS-II Project and the U.S. Department of Energy, Contract DE-AC02-76SF00515
The SLAC National Accelerator Laboratory is currently constructing a major upgrade to its accelerator, the Linac Coherent Light Source II (LCLS-II). Several Department of Energy national laboratories, including the Thomas Jefferson National Accelerator Facility (JLab) and Fermi National Accelerator Laboratory (FNAL), are participating in this project. The 1.3-GHz cryomodules for this project consist of eight cavities separated by bellows (expansion joints) and spools (tube sections), which are copper plated for RF conduction. JLab is responsible for procurement of these bellows and spools, which are delivered to JLab and FNAL for assembly into cryomodules. Achieving accelerator-grade copper plating is always a challenge and requires careful specification of requirements and application of quality control processes. Due to the demanding technical requirements of this part, JLab implemented procurement strategies to make the process more efficient as well as provide process redundancy. This paper discusses the manufacturing challenges that were encountered and resolved, as well as the strategies that were employed to minimize the impact of any technical issues.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA132  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)