Author: Liu, Y.
Paper Title Page
TUPVA099 Preparation for the CSNS-RCS Commissioning 2317
 
  • Y.W. An, Y.D. Liu, Y. Liu, S. Wang, S.Y. Xu
    IHEP, Beijing, People's Republic of China
 
  Funding: Work supported by National Natural Science Foundation of China (11405189)
As a key part of the China Spallation Neutron Source (CSNS) Project, the Rapid Cycling Synchrotron (RCS) accumulates and accelerates the proton beam from 80MeV to 1.6GeV for extracting and striking the target with a repetition rate of 25Hz. As a commissioning plan, the BPM offset should be carefully investigated before closed orbit distortion (COD) correction. The fast response correctors are installed to correct orbit distortion and model the lattice of the RCS in every 1ms period. The bunch-by-bunch data from BPMs are collected and decomposed for better known of the RCS Lattice.
 