TUPAB030 Construction and Status of the Thrice Recirculating S-DALINAC 1384
 
  • M. Arnold, R. Grewe, J. Pforr, N. Pietralla
    TU Darmstadt, Darmstadt, Germany
  • C. Eschelbach, M. Lösler
    Frankfurt University of Applied Sciences, Frankfurt am Main, Germany
  • F. Hug
    IKP, Mainz, Germany
  • T. Kürzeder
    HIM, Mainz, Germany
 
  Funding: Work supported by DFG through RTG 2128 and CRC 634.
From 1991 until 2015 the S-DALINAC (Superconducting-DArmstadt-LINear-ACcelerator) was operated as a twice recirculating electron accelerator. Its design energy of 130 MeV in cw-operation was not reached so far due to a lower quality factor of the SRF cavities and thus a higher dissipated power to the helium bath. In 2015/2016 a third recirculation has been built. Enabling a fourth passage through the main linac, the accelerating gradients can be reduced to fit the resulting dissipated power to the available cooling power for running at design energy. The upgrade to a thrice recirculating accelerator required the reconstruction of main parts of the existing lattice as well as an installation of a new beam line. All magnets had to be aligned carefully in position and orientation using high-precision metrology sensors. This contribution will present an overview of the construction and the alignment process. A latest status of the commissioning will be given.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPAB030  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)