Author: Lamont, M.
Paper Title Page
TUPVA005 Impact of the Crossing Angle on Luminosity Asymmetries at the LHC in 2016 Proton Physics Operation 2035
SUSPSIK001   use link to see paper's listing under its alternate paper code  
 
  • M. Hostettler
    LHEP, Bern, Switzerland
  • F. Antoniou, I. Efthymiopoulos, K. Fuchsberger, G. Iadarola, N. Karastathis, M. Lamont, Y. Papaphilippou, G. Papotti, J. Wenninger
    CERN, Geneva, Switzerland
 
  During 2016 proton physics operation at the CERN Large Hadron Collider (LHC), an asymmetry of up to 10% was observed between the luminosities measured by the ATLAS and CMS experiments. As the same bunch pairs collide in both experiments, a difference in luminosities must be of either geometric or instrumental origin. This paper quantifies the impact of the crossing angle on this asymmetry. As the beams cross in different planes in the two experiments, non-round beams are expected to yield an asymmetry due to the crossing angle. Results from crossing angle measurements at both experiments are also shown and the impact on the luminosities is evaluated.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA005  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPVA126 The SPS Beam Dump Facility 2389
 
  • M. Lamont, G. Arduini, M. Battistin, M. Brugger, M. Calviani, F. B. Dos Santos Pedrosa, M.A. Fraser, L. Gatignon, S.S. Gilardoni, B. Goddard, J.L. Grenard, C. Heßler, R. Jacobsson, V. Kain, K. Kershaw, E. Lopez Sola, J.A. Osborne, A. Perillo-Marcone, H. Vincke
    CERN, Geneva, Switzerland
 
  The proposed SPS beam dump facility (BDF) is a fixed-target facility foreseen to be situated at the North Area of the SPS. Beam dump in this context implies a target aimed at absorbing the majority of incident protons and containing most of the cascade generated by the primary beam interaction. The aim is a general purpose fixed target facility, which in the initial phase is aimed at the Search for Hidden Particles (SHiP) experiment. Feasibility studies are ongoing at CERN to address the key challenges of the facility. These challenges include: slow resonant extraction from the SPS; a target that has the two-fold objective of producing charged mesons as well as stopping the primary proton beam; and radiation protection considerations related to primary proton beam with a power of around 355 kW. The aim of the project is to complete the key technical feasibility studies in time for the European Strategy for Particle Physics (ESPP) update foreseen in 2020. This is in conjunction with the recommendation by the CERN Research Board to the SHiP experiment to prepare a comprehensive design study as input to the ESPP.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA126  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)