The Berlin Energy Recovery Linac project has taken shape during the past year. The magnets have been set up in the newly constructed subterraneous hall; first electrons are expected in the SRF-gun test laboratory in June 2017. Starting in February 2018 the complete gun module will be transferred to the accelerator hall for the commissioning of BERLinPro. For the first months, operation is planned without further accelerating structures (booster and linac), due to delays in their fabrication. Several modes of operation are applicable at this early stage [1]. The available hardware is displayed and the adapted optics at 2.7 MeV and at 6.5 MeV (including the booster) are presented. The trajectory distortions under the influence of the earth magnetic field are studied. The concept for trajectory correction is outlined.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPAB033  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPVA005 Status of the Berlin Energy Recovery Linac Project BERLinPro 855
 
  • M. Abo-Bakr, W. Anders, K.B. Bürkmann-Gehrlein, A.B. Büchel, P. Echevarria, A. Frahm, H.-W. Glock, F. Glöckner, F. Göbel, B.D.S. Hall, S. Heling, H.-G. Hoberg, A. Jankowiak, C. Kalus, T. Kamps, G. Klemz, J. Knedel, J. Knobloch, J. Kolbe, G. Kourkafas, J. Kühn, B.C. Kuske, J. Kuszynski, D. Malyutin, A.N. Matveenko, M. McAteer, A. Meseck, C.J. Metzger-Kraus, R. Müller, A. Neumann, N. Ohm, K. Ott, E. Panofski, F. Pflocksch, J. Rahn, M. Schmeißer, O. Schüler, M. Schuster, J. Ullrich, A. Ushakov, J. Völker
    HZB, Berlin, Germany
 
  Funding: Work supported by German Bundesministerium für Bildung und Forschung, Land Berlin, and grants of Helmholtz Association.
The Helmholtz-Zentrum Berlin is constructing the Energy Recovery Linac Prototype BERLinPro, a demonstration facility for the science and technology of ERLs for future light source applications. BERLinPro is designed to accelerate a high current (100 mA, 50 MeV), high brilliance (norm. emittance below 1 mm mrad) cw electron beam. We report on the project status. This includes the completion of the building and the installation of the first accelerator components as well as the assembly of the SRF gun and GunLab beam diagnostics, which are now ready for commissioning.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA005  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPVA007 Simulations for Beam-Based Measurements in BERLinPro 859
 
  • M. McAteer, M. Abo-Bakr, J. Knedel, G. Kourkafas, B.C. Kuske, J. Völker
    HZB, Berlin, Germany
 
  BERLinPro is an energy recovery linac project whose goal is to establish the accelerator physics knowledge and technology needed to produce 50 MeV beams with high current, low normalized emittance, and low losses. Precise measurements of beam parameters are essential for demonstrating the achievement of performance goals. In this paper we present simulations for measurements of energy, energy spread, and bunch length using the tracking code Astra.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA007  