Author: Kisker, H.
Paper Title Page
WEPVA029 SIS100 Tunnel Design and Status 3316
 
  • C. Omet, J. Falenski, G. Fehrenbacher, H. Kisker, K. Konradt, A. Sokolov, P.J. Spiller
    GSI, Darmstadt, Germany
  • A. Fischer
    FAIR, Darmstadt, Germany
 
  As the FAIR project is proceeding, many of the building and tunnel designs in the meanwhile are frozen and documents are prepared for tendering. For the future FAIR driver accelerator, SIS100, the accelerator tunnel T110 comprises a 1100 m long tunnel, which has a depth of 17 m under ground. In this paper, its environmental boundary conditions, design principles and the finally chosen layout are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA029  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)