Paper | Title | Page |
---|---|---|
THPVA033 | Towards commissioning the Fermilab Muon g-2 Experiment | 4505 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy. Starting this summer, Fermilab will host a key exper-iment dedicated to the search for signals of new phys-ics: The Fermilab Muon g-2 Experiment. Its aim is to precisely measure the anomalous magnetic moment of the muon. In full operation, in order to avoid contami-nation, the newly born secondary beam is injected into a 505 m long Delivery Ring (DR) wherein it makes several revolutions before being send to the experi-ment. Part of the commissioning scenario will execute a running mode wherein the passage from the DR will be skipped. With the aid of numerical simulations, we provide estimates of the expected performance. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-THPVA033 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |