Author: Kester, O.K.
Paper Title Page
TUPAB022 TRIUMF ARIEL e-Linac Ready for 30 MeV 1361
 
  • S.R. Koscielniak, Z.T. Ang, K. Fong, J.J. Keir, O.K. Kester, M.P. Laverty, R.E. Laxdal, Y. Ma, A.K. Mitra, T. Planche, D.W. Storey, E. Thoeng, B.S. Waraich, Z.Y. Yao, V. Zvyagintsev
    TRIUMF, Vancouver, Canada
 
  Funding: TRIUMF is funded under a contribution agreement with the National Research Council of Canada.
The ARIEL electron linac (e-linac) in its present configuration has a 10 mA electron gun and a single-cavity 10 MeV injector cryomodule followed by the accelerator cryomodule intended to house two 10-MeV-capable SRF cavities. There are momentum analysis stations at 10 MeV and 30 MeV. In October 2014, using a total of two cavities, the e-linac demonstrated 22.9 MeV acceleration. In 2017 an additional SRF cavity was installed in the accelerator cryomodule, thereby completing its design specification; and leading to 30 MeV acceleration capability. The 9-cell 1.3 GHz cavities are a variant of the TESLA type, modified for c.w. operation and recirculation. An unusual feature of the module is the power feed of two cavities by one klystron through a wave-guide type power divider, and closed loop control of the combined voltage from the cavities. Initial operation of the two-cavity control, including power and phase balancing, is reported.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPAB022  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPIK021 Structural Mechanical Analysis of 4-Rod RFQ Structures in View of a Newly Revised CW RFQ for the HLI at GSI 4142
SUSPSIK091   use link to see paper's listing under its alternate paper code  
 
  • D. Koser, H. Podlech
    IAP, Frankfurt am Main, Germany
  • P. Gerhard, L. Groening
    GSI, Darmstadt, Germany
  • O.K. Kester
    TRIUMF, Vancouver, Canada
 
  Funding: BMBF Contr. No. 05P15RFRBA
The High Charge State Injector (HLI) at the GSI Helmholtz Centre for Heavy Ion Research in Darmstadt, Germany, serves as one of the two injector linacs for the UNILAC as well as dedicated injector for the upcoming cw linac project for super heavy element research. As the front end of the HLI is planned to be upgraded for cw operation a newly revised cw capable RFQ structure with an operating frequency of 108 MHz is required. The existent 4-rod structure, which was commissioned at the HLI in 2010, suffers from severe modulated rf power reflections originating from mechanical oscillations of the electrodes that both limit the achievable performance and impede stable operation*. Besides preceding vibration measurements that were done by GSI using a laser vibrometer**, the structural mechanical behavior of the 4-rod geometry was extensively analyzed using ANSYS Workbench. Thereby the crucial mechanical eigenmodes could be identified and their impact on the rf properties was investigated by simulations using CST MWS. A completely newly revised 4-rod RFQ design with optimized structural rigidity was developed of which a 6-stem prototype is currently being manufactured.
*P. Gerhard et al., Experience With a 4-Rod CW Radio Frequency Quadrupole, LINAC12, THPLB07
**P. Gerhard et al., In Situ Measurements of Mechanical Vibrations of a 4-Rod RFQ at GSI, LINAC14, TUPP057
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-THPIK021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)