Author: Jonker, M.
Paper Title Page
TUPIK100 Methodology Applied for Dependability Studies on the Compact Linear Collider 1943
 
  • O. Rey Orozko, A. Apollonio, M. Jonker
    CERN, Geneva, Switzerland
 
  The Compact Linear Collider (CLIC) scheme presents several challenges in terms of reliability and availability. The goal of the study is to demonstrate the requirements for availability and reliability by identifying the key factors on failure effects and analysing possible operational scenarios and designs. Hence, a good knowledge on CLIC system structures, failure modes and failure effects is needed. This paper reports about the set-up of the studies from the definition of the CLIC failure catalogue to the implementation of the models and analysis of the results. It will present in detail the steps that need to be followed when performing such a study. Finally, the CLIC Drive Beam Quadrupoles powering system will be presented as a use-case.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPIK100  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPVA012 Beam Related Machine Protection of the Future Circular Collider 2063
 
  • Y.C. Nie, M. Jonker, R. Schmidt
    CERN, Geneva, Switzerland
 
  In the Future Circular Collider (FCC) study, each nominal proton beam at top particle energy of 50 TeV has an energy of 8500 MJ, which is more than 20 times the energy of today's Large Hadron Collider (LHC) beam. Machine protection of such a high-energy and high-energy density accelerator becomes very challenging. In this paper, preliminary considerations of beam related machine protection issues of the FCC will be reported. Based on the current optics design, a few major critical equipment failures that could potentially lead to very fast (within a few turns) beam losses have been studied. The serious failure scenarios that have been considered, typically occurring at locations with high beta functions, include powering failures of normal conducting magnets, quenches of superconducting magnets as well as critical RF failures. Some fundamental questions related to the beam interlock system, e.g., the need for additional particle free abort gaps to shorten the synchronization time before executing a beam dump, will be discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA012  