Author: Jehanno, D.
Paper Title Page
MOPAB027 Preparation of CVD Diamond Detector for fast Luminosity Monitoring of SuperKEKB 135
SUSPSIK070   use link to see paper's listing under its alternate paper code  
 
  • C.G. Pang, P. Bambade, D. El Khechen, D. Jehanno, V. Kubytskyi, Y. Peinaud, C. Rimbault
    LAL, Orsay, France
 
  The SuperKEKB e+-e collider aims to reach a very high luminosity of 8×10 35 cm'2s'1, using highly focused ultra-low emittance bunches colliding every 4ns. To meet the requirement of the dithering feedback system used to stabilize the horizontal orbit at the IP (interaction point), a relative precision of 10 '3 in 1ms is specified for the fast luminosity monitoring, which can be in principle achieved thanks to the large cross section of the radiative Bhabha process. This paper firstly presents the fraction of detected Bhabha scattering positrons with a new beam pipe arrangement coupled with a Tungsten radiator to be installed in the Low Energy Ring; Then the characteristics of signals from a sCVD diamond detector with thickness of 140'm coupled with a broadband current amplifier were studied based on tests with a Sr-90 source; Finally, simulated results for the reconstructed luminosity and the relative precision with different assumed luminosities are also reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPAB027  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPIK059 Recent Progress of Dithering System at SuperKEKB 1827
 
  • Y. Funakoshi, H. Fukuma, T. Kawamoto, M. Masuzawa, S. Nakamura, K. Ohmi, T. Oki, S. Uehara
    KEK, Ibaraki, Japan
  • P. Bambade, D. El Khechen, D. Jehanno, V. Kubytskyi, C. Rimbault
    LAL, Orsay, France
  • A.S. Fisher
    SLAC, Menlo Park, California, USA
  • U. Wienands
    ANL, Argonne, Illinois, USA
 
  Recent progress of the dithering system at SuperKEKB is described. Some details of the system layout are shown. Beam orbit and optics related issues are discussed. Preliminary tests of the some components in the Phase 1 beam commissioning or in the bench are described.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPIK059  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)