Author: Jacobsson, R.
Paper Title Page
TUOAB1 First LHC Transverse Beam Size Measurements With the Beam Gas Vertex Detector 1240
SUSPSIK078   use link to see paper's listing under its alternate paper code  
 
  • A. Alexopoulos, C. Barschel, E. Bravin, G. Bregliozzi, N. Chritin, B. Dehning, M. Ferro-Luzzi, M. Giovannozzi, R. Jacobsson, L.K. Jensen, O.R. Jones, V. Kain, R. Matev, M.N. Rihl, V. Salustino Guimaraes, R. Veness, S. Vlachos, B. Würkner
    CERN, Geneva, Switzerland
  • A. Bay, F. Blanc, S. Gianì, O. Girard, G.J. Haefeli, P. Hopchev, A. Kuonen, T. Nakada, O. Schneider, M. Tobin, Q.D. Veyrat, Z. Xu
    EPFL, Lausanne, Switzerland
  • R. Greim, W. Karpinski, T. Kirn, S. Schael, A. Schultz von Dratzig, G. Schwering, M. Wlochal
    RWTH, Aachen, Germany
 
  The Beam Gas Vertex detector (BGV) is an innovative beam profile monitor based on the reconstruction of beam-gas interaction vertices which is being developed as part of the High Luminosity LHC project. Tracks are identified using several planes of scintillating fibres, located outside the beam vacuum chamber and perpendicular to the beam axis. The gas pressure in the interaction volume is adjusted such as to provide an adequate trigger rate, without disturbing the beam. A BGV demonstrator monitoring one of the two LHC beams was fully installed and commissioned in 2016. First data and beam size measurements show that the complete detector and data acquisition system is operating as expected. The BGV operating parameters are now being optimised and the reconstruction algorithms developed to produce accurate and fast reconstruction on a CPU farm in order to provide real time beam profile measurements to the LHC operators.  
slides icon Slides TUOAB1 [3.456 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUOAB1  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPVA126 The SPS Beam Dump Facility 2389
 
  • M. Lamont, G. Arduini, M. Battistin, M. Brugger, M. Calviani, F. B. Dos Santos Pedrosa, M.A. Fraser, L. Gatignon, S.S. Gilardoni, B. Goddard, J.L. Grenard, C. Heßler, R. Jacobsson, V. Kain, K. Kershaw, E. Lopez Sola, J.A. Osborne, A. Perillo-Marcone, H. Vincke
    CERN, Geneva, Switzerland
 
  The proposed SPS beam dump facility (BDF) is a fixed-target facility foreseen to be situated at the North Area of the SPS. Beam dump in this context implies a target aimed at absorbing the majority of incident protons and containing most of the cascade generated by the primary beam interaction. The aim is a general purpose fixed target facility, which in the initial phase is aimed at the Search for Hidden Particles (SHiP) experiment. Feasibility studies are ongoing at CERN to address the key challenges of the facility. These challenges include: slow resonant extraction from the SPS; a target that has the two-fold objective of producing charged mesons as well as stopping the primary proton beam; and radiation protection considerations related to primary proton beam with a power of around 355 kW. The aim of the project is to complete the key technical feasibility studies in time for the European Strategy for Particle Physics (ESPP) update foreseen in 2020. This is in conjunction with the recommendation by the CERN Research Board to the SHiP experiment to prepare a comprehensive design study as input to the ESPP.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA126  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)