Author: Hong, B.
Paper Title Page
THPVA152 Performance of ATCA LLRF System at LCLS 4817
 
  • J.M. D'Ewart, J.C. Frisch, B. Hong, K.H. Kim, J.J. Olsen, D. Van Winkle
    SLAC, Menlo Park, California, USA
 
  Funding: Work supported by Department of Energy contract DE-AC02-76SF00515.
The low level RF control for the SLAC LINAC is being upgraded to provide improved performance and maintainability. The new LLRF system is based on the SLAC ATCA common platform hardware. RF control is achieved through a high performance FPGA based DDS/DDC system. The signal processing is designed to be phase insensitive, allowing the use of modest performance on-board digitizer clock and LO. The prototype LLRF control system was installed and used to operate RF station 28-2 in LCLS-I. Design details and prototype performance results will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-THPVA152  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)