Author: Holma, J.
Paper Title Page
WEPVA024 Design of an Inductive Adder for the FCC Injection Kicker Pulse Generator 3312
 
  • D. Woog, M.J. Barnes, L. Ducimetière, J. Holma, T. Kramer
    CERN, Geneva, Switzerland
 
  The injection system for a 100 TeV centre-of-mass collider is an important part of the Future Circular Collider (FCC) study. Due to issues with conventional kicker systems, such as self-triggering and long term availability of thyratrons and limitations of HV-cables, innovative design changes are planned for the FCC injection kicker pulse generator. An inductive adder (IA) based on semiconductor (SC) switches is a promising technology for kicker systems. Its modular design, and the possibility of an active ripple suppression are significant advantages. Since the IA is a complex device, with multiple components whose characteristics are important, a detailed design study and construction of a prototype is necessary. This paper summarizes the system requirements and constraints, and describes the main components and design challenges of the prototype IA. It outlines the results from simulations and measurements on different magnetic core materials as well as on SC switches. The paper concludes on the design choices and progress for the prototype to be built at CERN.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA024  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPVA098 Measurements on a 12.5 kV Prototype Inductive Adder for the CLIC DR Extraction Kickers 3487
 
  • J. Holma, M.J. Barnes
    CERN, Geneva, Switzerland
 
  The CLIC study is investigating the technical feasibility of an electron-positron collider with high luminosity and a nominal centre-of-mass energy of 3 TeV. The pre-damping rings and damping rings (DRs) will produce ultra-low emittance beam with high bunch charge. To avoid beam emittance increase, the DR kicker systems must provide extremely stable field pulses during injection and extraction of bunches. The DR extraction kicker system consists of a stripline kicker and two pulse modulators. The current specifications for the modulators call for pulses with 160 ns or 900 ns flattop duration of ±12.5 kV and 305 A, with ripple of not more than ±0.02 % (±2.5 V). An inductive adder is a very promising approach to meeting the specifications because analogue modulation methods can be applied to adjust the output waveform. Recently, the first full-scale, 20-layer, 12.5 kV prototype inductive adder has been assembled at CERN and testing has commenced. The goal is to tailor the output waveform of the prototype to the waveform required for the DR extraction stripline kicker. The results of the initial tests and measurements are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA098  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)