WEPVA103 Renovation of CERN Antiproton Production Target Area and Associated Design, Testing and R&D Activities 3506
 
  • C. Torregrosa, M.E.J. Butcher, M. Calviani, A. De Macedo, S. De Man, R. Ferriere, E. Grenier-Boley, B. Lefort, E. Lopez Sola, A. Perillo-Marcone, M.A. Timmins
    CERN, Geneva, Switzerland
 
  In the Antiproton Decelerator (AD) Target Area antiprotons are produced by the collisions of 26 GeV/c proton beam with a fixed target. They are then collected by a 400 kA pulsed magnetic horn, momentum selected and injected into the AD facility. The area has been in operation since the 80s, keeping most of the equipment dating back to this period. A major upgrade is foreseen during the CERN's Long Shutdown 2 to guarantee the next decades of antiproton physics. Among other R&D activities, three main systems are within the scope of this upgrade; (i) a new antiproton target design, pressurized-air-cooled and with a new core configuration based on the results from the HiRadMat27 experiment. (ii) Manufacturing of a set of new magnetic horns and testing them using a dedicated test bench replicating the real horn setup. (iii) Design of new target and horn's trolleys, which are responsible for their positioning as well as providing an efficient long term maintenance giving the high radioactivity of the area. This paper presents an overview of these and other critical activities associated to the renovation of the target area, including status and direction of the new proposed designs.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA103  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPVA109 Design of the New PS Internal Dumps, in the Framework of the LHC Injector Upgrade (LIU) Project 3521
 
  • G. Romagnoli, J.A. Briz Monago, M. Calviani, J.J. Esala, E. Grenier-Boley, A. Masi, F.-X. Nuiry, A. Perillo-Marcone, T. Polzin, V. Vlachoudis
    CERN, Geneva, Switzerland
 
  For the LHC injectors upgrade (LIU) at CERN, the two PS (Proton Synchrotron) dumps will be redesigned and upgraded for the new high intensity beams. The EN-STI group is in charge of the design and installation of the new dumps, foreseen for the next CERN's Long Shutdown in 2019-2020. As internal dumps, the PS dumps have been installed in 1975 directly in the PS vacuum ring between the main bending magnets and they are operating since then. The dumps enter the beam line when requested by beam operation, with a 6 kg Cu block moved quickly with a spring-based mechanism. This Cu block is not expected to survive the impact of the future beams. A new design is presented for the dump core based on FLUKA-ANSYS coupled simulations. The dumps should work with any PS beam foreseen within LIU, be water cooled in ultra-high vacuum medium, and enter the beam chamber in less than 250 ms. The dump should be used 200000 times per year, with a lifetime of 20 years, with almost zero maintenance. The new challenging design is based on an oscillating thin blade shaving turn after turn the circulating beam. The material considered for the blade are Cu, Ti or CuCrZr with embedded cooling channels.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA109  