TUPVA147 Progress on the Proton Power Upgrade of the Spallation Neutron Source 2445
 
  • M.S. Champion, R.A. Dean, J. Galambos, M.P. Howell, M.A. Plum, B.W. Riemer
    ORNL, Oak Ridge, Tennessee, USA
 
  Funding: Work performed at (or work supported by) Oak Ridge National Laboratory, which is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy.
The Proton Power Upgrade Project is underway at the Spallation Neutron Source at Oak Ridge National Laboratory and will double the proton beam power capability from 1.4 MW to 2.8 MW to provide increased neutron intensity at the first target station and to support future operation of the second target station. This will be accomplished by increasing the beam energy to 1.3 GeV and the beam current to 38 mA (average during the macro-pulse). Installation of 28 additional superconducting cavities and their associated technical systems will provide for the energy increase. Increased beam loading throughout the accelerator will be accommodated primarily through the use of existing margin in the RF systems and the installation of 700 kW klystrons to power the new superconducting cavities. Upgrades of a few existing RF stations may also be needed. The injection and extraction regions of the accumulator ring will be upgraded, a ring to second target station tunnel stub will be constructed, and a 2 MW target will be developed for the first target station. The project anticipates attainment of Critical Decision 1 in 2017 to ratify the project conceptual design and cost range.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA147  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)