  Replacement of all J-PARC MR cavities has completed in this summer to increase the RF voltage. Nine sets of new high-gradient FT3L cavities will generate the required RF voltage for the 1.16 second cycle operation. Upgrade of magnet power supplies is planned and the cycle time becomes 1.3 seconds from the present 2.48 seconds in FY2018 to achieve the beam power of 750 kW-1 MW. For the further improvement of beam power, a new rapid-cycling booster is considered to increase the injection energy of the MR from 3 GeV to 6-8 GeV. By the reduction of the space charge effects, the injection time can be extended and a batch compression scheme becomes possible. It will increase the number of bunches from 8 to 11 or 12 during the beam injection. And, recent beam study of the 3 GeV RCS shows the potential capability of 6.6·1013 proton per bunch. Combining these improvements with the booster, the beam power of 3 MW will be manageable.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA091  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)