Paper |
Title |
Page |
MOPIK057 |
Strategy of Beam Tuning Implementation for the SARAF MEBT and SC Linac |
652 |
|
- P.A.P. Nghiem, D. Uriot
CEA/DSM/IRFU, France
- B. Dalena, J. Dumas, N. Pichoff
CEA/IRFU, Gif-sur-Yvette, France
|
|
|
Beam dynamics of the MEBT and Superconducting Linac in the SARAF accelerator are being finalized. A strategy for beam tuning implementation is applied to this section, leading to specifying the complete set of error tolerances / beam measurements / correctors. A systematic and precise methodology in several steps is applied, leading to fairly distributing the error budget, from which correction schemes are studied, allowing to determine the necessary beam measurements and correctors.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPIK057
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPIK058 |
Beam Dynamic Studies for the SARAF MEBT and SC Linac |
655 |
|
- J. Dumas, N. Pichoff, D. Uriot
CEA/IRFU, Gif-sur-Yvette, France
- P.A.P. Nghiem
CEA/DSM/IRFU, France
|
|
|
The SARAF MEBT and Super Conducting Linac (SCL) transport and accelerate deuterons or protons from the RFQ to the final energy. In this report, beam dynamics studies for this section are described. A rational distribution of the different roles of the MEBT leads to defining its necessary quadrupole/rebuncher composition. This allows easy beam re-tuning following changes from the RFQ or the SC Linac. After observing evidences of beam losses mainly due to phase unhooking, efforts have been dedicated to enlarge the SCL longitudinal acceptance. A combination of cavity field phases is found so that the required final beam energy is also fulfilled.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPIK058
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPVA052 |
The SARAF-LINAC Project 2017 Status |
2194 |
|
- N. Pichoff, N. Bazin, D. Chirpaz-Cerbat, R. Cubizolles, J. Dumas, R.D. Duperrier, G. Ferrand, B. Gastineau, P. Gastinel, F. Gougnaud, M. Jacquemet, C. Madec, L. Napoly, P.A.P. Nghiem, F. Senée, D. Uriot
CEA/IRFU, Gif-sur-Yvette, France
- D. Berkovits
Soreq NRC, Yavne, Israel
- M. Di Giacomo
GANIL, Caen, France
|
|
|
SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the superconducting linac (SARAF-LINAC Project). This paper presents to the accelerator community the status at March 2017 of the SARAF-LINAC Project.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA052
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|