Author: Buteau, A.
Paper Title Page
WEPAB004 Progress Status for the 10 Year Old SOLEIL Synchrotron Radiation Facility 2564
 
  • L.S. Nadolski, Y.-M. Abiven, P. Brunelle, A. Buteau, N. Béchu, M.-E. Couprie, X. Delétoille, J.M. Dubuisson, C. Herbeaux, N. Hubert, M. Labat, J.-F. Lamarre, P. Lebasque, A. Lestrade, A. Loulergue, M. Louvet, P. Marchand, O. Marcouillé, F. Marteau, A. Nadji, R. Nagaoka, F. Ribeiro, K.T. Tavakoli, M.-A. Tordeux
    SOLEIL, Gif-sur-Yvette, France
 
  Synchrotron SOLEIL has just turned 10 years since its commissioning. The 2.75 GeV facility is now delivering very stable photon beams to 29 beam lines. A total of 5 operation modes are available in top-up. Maintaining and updating the key performance metric remains a daily work facing both aging of components and tighter operation requirements. Low-alpha operation is attracting more beam lines leading us to an upgrade of the Booster (BOO) radiofrequency (RF) system in order to increase the injection efficiency into the storage ring (SR). The femtoslicing experiment is now in production for a hard X-ray beam line; a dedicated chicane has been installed for a second beam line in the soft X-ray regime. The two long canted beam lines can operate simultaneously at minimum gaps since May 2016 thanks to the introduction of a dedicated photon absorber and a fast angle interlock. R&D work in several areas will be reported. In parallel lattice design are in progress both for short term and long term evolution of the ring performance.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPAB004  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)