A Consolidation Roadmap for the CERN Power Converters |
3514 |
|
- D. Nisbet, J.-P. Burnet
CERN, Geneva, Switzerland
|
|
|
At CERN the Electrical Power Converter group is re-sponsible for the design and exploitation of more than 5000 power systems throughout the accelerator complex, powering predominantly magnet circuits, in addition to RF and electro-static systems. Currently, a variety of systems are in operation, in some cases these are over 30 years old. Furthermore, the group must maintain operationally a total of six hardware platforms, each with dedicated software. In light of this, a consolidation roadmap has been determined to rejuvenate the power converter complex and to reduce the total number of control platforms. This paper presents a summary of the CERN power converter equipment to be consolidated, and the roadmap to achieve consolidation.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA106
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|