Author: Bruniquel, A.
Paper Title Page
MOPVA038 Manufacturing Status of the IFMIF LIPAc SRF Linac 939
 
  • N. Bazin, P. Carbonnier, P. Contrepois, J. Plouin, B. Renard
    CEA/DSM/IRFU, France
  • C. Boulch, A. Bruniquel, J.K. Chambrillon, G. Devanz, P. Hardy, H. Jenhani, N. N'Doye, O. Piquet, A. Riquelme, D. Roudier
    CEA/DRF/IRFU, Gif-sur-Yvette, France
  • P. Charon, S. Chel, G. Disset, J. Relland
    CEA/IRFU, Gif-sur-Yvette, France
  • D. Regidor, F. Toral
    CIEMAT, Madrid, Spain
 
  This paper gives the fabrication status of the IFMIF cryomodule. This cryomodule will be part of the Linear IFMIF Prototype Accelerator (LIPAc) whose construction is ongoing at Rokkasho, Japan. It is a full scale of one of the IFMIF accelerator, from the injector to the first cryomodule. The cryomodule contains all the necessary equipment to transport and accelerate a 125 mA deuteron beam from an input energy of 5 MeV up to the output energy of 9 MeV. It consists of a horizontal vacuum tank of around 6 m long, 3 m high and 2.0 m wide, which includes 8 superconducting HWRs for beam acceleration, working at 175 MHz and at 4.45 K, 8 Power Couplers to provide RF power to cavities up to 70 kW CW in LIPAc case and 200 kW CW in IFMIF case, and 8 Solenoid Packages as focusing elements.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA038  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPVA040 Status of the ESS Elliptical Cryomodules at CEA Saclay 945
 
  • P. Bosland, C. Arcambal, F. Ardellier, S. Berry, A. Bouygues, A. Bruniquel, E. Cenni, J.-P. Charrier, C. Cloué, G. Devanz, F. Éozénou, T. Hamelin, X. Hanus, P. Hardy, C. Marchand, O. Piquet, J. Plouin, J.P. Poupeau, T. Trublet
    CEA/DRF/IRFU, Gif-sur-Yvette, France
  • G. Costanza
    Lund University, Lund, Sweden
  • C. Darve
    ESS, Lund, Sweden
  • P. Michelato
    INFN/LASA, Segrate (MI), Italy
  • G. Olivier
    IPN, Orsay, France
  • F. Peauger
    CEA/DSM/IRFU, France
 
  The first ESS prototype cryomodule with medium beta cavities named M-ECCTD is being assembled at CEA Saclay. The Q curves of the 4 cavities mounted inside the cryomodule are presented, and the four power couplers have been conditioned at high power before their assembly onto the cavity string. Completion of the M-ECCTD assembly outside clean room is in progress as well as the finalization of the RF power test stand preparation. RF power tests of the M-ECCTD will be performed during summer 2017. CEA is preparing the production of the ESS medium and high beta cryomodules of the series before the test of the M-ECCTD and the contracts for the procurement of the most critical components have already been signed  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA040  