Author: Baffes, C.M.
Paper Title Page
TUPVA138 Status of the Warm Front End of PIP-II Injector Test 2421
 
  • A.V. Shemyakin, M.L. Alvarez, R. Andrews, C.M. Baffes, J.-P. Carneiro, A.Z. Chen, P. Derwent, J.P. Edelen, D. Frolov, B.M. Hanna, L.R. Prost, G.W. Saewert, A. Saini, V.E. Scarpine, V.L. Sista, J. Steimel, D. Sun, A. Warner
    Fermilab, Batavia, Illinois, USA
  • V.L. Sista
    BARC, Mumbai, India
 
  Funding: Fermilab is operated by Fermi Research Alliance, LLC under Contract No. DEAC02-07CH11359 with the United States Department of Energy
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test is under construction. It includes a 10 mA DC, 30 keV H ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the warm front end.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA138  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)