Author: Apollonio, M.
Paper Title Page
WEPAB091 Progress on Transparent Realignment of the Diamond Storage Ring 2790
 
  • M. Apollonio, R. Bartolini, W.J. Hoffman, A.J. Rose, A. Thomson
    DLS, Oxfordshire, United Kingdom
  • R. Bartolini
    JAI, Oxford, United Kingdom
 
  The mechanical alignment of Diamond Storage Ring is achieved by means of a 5-axis motion system under remote control via the EPICS toolkit from the Diamond Control Room. We have completed the first phase of the realignment program meant to improve the mechanical alignment of the machine by carefully moving the magnet girders with a virtually zero impact on the associated beamlines, hence the name Transparent Realignment (TR). During this phase we have equipped and realigned 3 out of 24 cells, involving two beamlines. We have also tested and perfected the technique to execute a move with live beam and total remote control of the realignment process. The program has entered a second phase entailing the commissioning of 6 more cells. Details of tests on the machine are reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPAB091  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAB095 Electron Beam Commissioning of the DDBA Modification to the Diamond Storage Ring 2800
 
  • I.P.S. Martin, M. Apollonio, C.P. Bailey, R. Bartolini, C. Christou, R.T. Fielder, M.J. Furseman, E. Koukovini-Platia, T. Pulampong, G. Rehm, W.A.H. Rogers, B. Singh
    DLS, Oxfordshire, United Kingdom
  • R. Bartolini
    JAI, Oxford, United Kingdom
 
  The Diamond storage ring has been modified by replacing one of the existing double bend achromat (DBA) cells with a double-DBA (DDBA) cell*. This change represents the largest modification to the storage ring since it was first commissioned in 2006, and was installed and fully commissioned during a single 8 week shutdown in autumn 2016. In view of this tight schedule, the planned commissioning steps and all high-level software needed to be developed and thoroughly tested in advance. Electron beam commissioning occupied the final 2 weeks of the shutdown, during which the injected electrons were captured and accumulated, the correct linear lattice was established, the nonlinear beam dynamics were studied, IDs were closed and the target 300 mA was achieved. This paper presents an overview of these activities.
* R.P. Walker et al., 'The Double-Double Bend Achromat (DDBA) Lattice Modification for the Diamond Storage Ring', Proc. IPAC 2014, MOPRO103, (2014)
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPAB095  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAB153 An Online Multi-Objective Optimisation Package 4092
 
  • I.P.S. Martin, M. Apollonio, R. Bartolini, M.J. Furseman
    DLS, Oxfordshire, United Kingdom
  • R. Bartolini, G.A. Bird
    JAI, Oxford, United Kingdom
  • D.R. Obee
    Durham University, Durham, United Kingdom
 
  The overall performance of an electron storage ring is critically dependant on a large number of variables. It can be characterised in many ways, such as by lifetime, injection efficiency, beam stability and so on. It is frequently the case however that improving one parameter comes at the cost of harming another. Equally, given the large number of variables involved in optimising the ring performance, the true, global optimum solution may be difficult to identify using simple parameter scans. In order to address this problem, a flexible optimisation tool has been developed. This tool is capable of optimising several parameters at once and can cope with an arbitrary number of variables (individually or in families). The tool is designed to be robust to measurement noise, and has been applied to a number of different optimisation problems. This paper presents an overview of the package, as well as the results of the first tests.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-THPAB153  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)