Author: Adraktas, A.
Paper Title Page
WEPVA099 Influence of Conducting Serigraphy Upon Field Pulse Shape of the SPS Extraction Kicker Systems 3491
 
  • A. Adraktas, M.J. Barnes, L. Ducimetière
    CERN, Geneva, Switzerland
 
  Fast pulsed magnets with ferrite yokes are used for beam extraction from the CERN SPS accelerator. These kickers are transmission line type magnets with a rectangular shaped aperture through which the beam circulates. Unless special precautions are taken, the beam impedance of the yoke can provoke significant induced heating, especially for high intensity beams. Previous upgrades of the SPS extraction kicker magnets have included silver fingers serigraphed on the surface of the ferrite facing the beam, to help shield the ferrite yoke from circulating beam. Beam based measurements of the extracted beam indicated that the serigraphy may influence the shape of the field pulse, causing it to increase slightly in magnitude during the flat-top. Hence theoretical studies have been carried out to determine whether the serigraphy influences the field pulse: these studies are reported in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA099  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPVA100 Operational Experience of the Upgraded LHC Injection Kicker Magnets During Run 2 and Future Plans 3495
 
  • M.J. Barnes, A. Adraktas, G. Bregliozzi, L. Ducimetière, B. Goddard, B. Salvant, J. Sestak, L. Vega Cid, W.J.M. Weterings, C. Yin Vallgren
    CERN, Geneva, Switzerland
 
  During Run 1 of the LHC, one of the injection kicker magnets caused occasional operational delays due to beam induced heating with high bunch intensity and short bunch lengths. In addition, there were also sporadic issues with vacuum activity and electrical flashover of the injection kickers. An extensive program of studies was launched and significant upgrades were carried out during Long Shutdown 1 (LS 1). These upgrades included a new design of beam screen to reduce both beam coupling impedance of the kicker magnet and the electric field associated with the screen conductors, hence decreasing the probability of electrical breakdown in this region. This paper presents operational experience of the injection kicker magnets during the first years of Run 2 of the LHC, including a discussion of faults and kicker magnet issues that limited LHC operation. In addition, in light of these issues, plans for further upgrades are briefly discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA100  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)