Paper |
Title |
Page |
WEPIK011 |
Ceramic Chamber Used in SuperKEKB High Energy Ring Beam Abort System |
2936 |
|
- T. Mimashi, N. Iida, M. Kikuchi, K. Kodama, T. Mori
KEK, Ibaraki, Japan
- K. Abe
Hitachi Power Semiconductor Device, Ltd., Hitachishi, Ibaraki, Japan
|
|
|
The water-cooled type ceramic chambers were used for Super-KEKB high energy ring beam abort system. Since the horizontal abort kicker magnets are required to have very fast rise time and large current, the gap of kicker magnet must be as small as possible. The thin and compact ceramic chamber were developed. The chamber has racetrack type chamber whose inner diameter is 60mm in horizontal and 40 mm in vertical. And the gap of horizontal kicker magnet is 70mm. The thickness of the ceramic chamber is 30 % reduced from that of KEKB. The 500mm long hollow type ceramic, which includes cooling water path inside, is fabricated. It makes the structure of ceramic chamber simple and compact. The new copper electroforming is applied to deposit the 100μmeter thickness Cu conducting layer on the inner wall of Kovar. The Cu conducting layer reduces the heat generated by image beam current on the Kovar brazering. They are installed in the Super-KEKB electron ring beam abort system, and used in the phase 1 operation. The paper describes the performance of the water-cooled ceramic chamber under phase 1 operation.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-WEPIK011
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPIK012 |
Performance of SuperKEKB High Energy Ring Beam Abort System |
2939 |
|
- T. Mimashi, Y. Enomoto, N. Iida, M. Kikuchi, K. Kodama, T. Mori, Y. Suetsugu
KEK, Ibaraki, Japan
- K. Abe
Hitachi Power Semiconductor Device, Ltd., Hitachishi, Ibaraki, Japan
- K. Kise, A. Tokuchi
Pulsed Power Japan Laboratory Ltd., Kusatsu-shi Shiga, Japan
|
|
|
New Beam abort system was installed at the Super-KEKB High Energy Ring. It was designed to enlarge the horizontal beam size at the beam extraction window to protect the extraction window, and it also makes the beam abort gap shorter. It consists of four horizontal kicker magnets, one vertical kicker to sweep the beam position in vertical direction, sextupole magnet to enlarge the horizontal beam size, one lambertson magnet, Ti extraction window and beam dump. Four horizontal kicker magnets and one vertical kicker magnet connects to the one power supply. The ceramic chambers cooled by the water are inserted in each kicker coils. The Abort system had been used during SuperKEKB phase 1 operation. This paper describes the performance of the abort system.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-WEPIK012
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|