The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.
TY - CONF AU - Higashi, N. AU - Asaoka, S. AU - Furukawa, K. AU - Haga, K. AU - Harada, K. AU - Higo, T. AU - Honda, T. AU - Honma, H. AU - Iida, N. AU - Iwase, H. AU - Kakihara, K. AU - Kamitani, T. AU - Kikuchi, M. AU - Kishimoto, Y. AU - Kobayashi, Y. AU - Kodama, K. AU - Kudo, K. AU - Kume, T. AU - Mikawa, K. AU - Mimashi, T. AU - Miyahara, F. AU - Miyauchi, H. AU - Nagahashi, S. AU - Nakamura, H. AU - Nakamura, N. AU - Natsui, T. AU - Nigorikawa, K.N. AU - Niwa, Y. AU - Nogami, T. AU - Obina, T. AU - Ogawa, Y. AU - Ono, M. AU - Ozaki, T. AU - Sagehashi, H. AU - Sanami, T. AU - Sato, M. AU - Satoh, M. AU - Suwada, T. AU - Tadano, M. AU - Tahara, T. AU - Takai, R. AU - Takaki, H. AU - Takasaki, S. AU - Tanaka, M. AU - Tanimoto, Y. AU - Tawada, M. AU - Toge, N. AU - Uchiyama, T. AU - Ueda, A. AU - Yamada, Y. AU - Yamamoto, M. AU - Yoshida, M. ED - Schaa, Volker RW ED - Arduini, Gianluigi ED - Pranke, Juliana ED - Seidel, Mike ED - Lindroos, Mats TI - Construction and Commissioning of Direct Beam Transport Line for PF-AR J2 - Proc. of IPAC2017, Copenhagen, Denmark, 14â19 May, 2017 C1 - Copenhagen, Denmark T2 - International Particle Accelerator Conference T3 - 8 LA - english AB - PF-AR was constructed as an accumulator ring for TRISTAN, and in the KEKB era it has been revitalized as a 6.5 GeV synchrotron radiation source. The injection energy was 3 GeV and the beam was accelerated to 6.5 GeV prior to the user run. The original beam transport line (BT) from the LINAC to the PF-AR shared its upstream part with the the BT line of KEKB High Energy Ring (HER). The injection-mode change from PF-AR to HER or vice versa needs about 10 minutes for the magnet cycling procedure of the shared part. In SuperKEKB, the upgrade of KEKB, the lifetime of HER is about 10 minutes. The mode-switch operation of the BT is, therefore, not allowed for maintaining the highest luminosity of the SuperKEKB. In order to avoid this problem, a new 6.5 GeV BT line dedicated to PF-AR has been constructed. This also enables the top-up injection for the user run. The commissioning of the new BT line has been completed in this March, and now the first user run has been operated successfully. PB - JACoW CP - Geneva, Switzerland SP - 2678 EP - 2680 KW - injection KW - linac KW - beam-transport KW - vacuum KW - operation DA - 2017/05 PY - 2017 SN - 978-3-95450-182-3 DO - 10.18429/JACoW-IPAC2017-WEPAB044 UR - http://jacow.org/ipac2017/papers/wepab044.pdf ER -