Title |
Optics Design and Observation for the Beam Abort System in SuperKEKB HER |
Authors |
- N. Iida, K. Egawa, Y. Enomoto, Y. Funakoshi, M. Kikuchi, T. Mimashi, Y. Ohnishi, K. Oide, Y. Suetsugu
KEK, Ibaraki, Japan
|
Abstract |
In the first commissioning of SuperKEKB, which is 'Phase 1', the new abort system is tested in the High Energy Ring (HER). There is a risk that aborted beams with low emittance and high current may destroy the window for extraction from beam pipe. In order to enlarge the aborted beam at the window, quadrupole field is applied only for the aborted beam. In the Low Energy Ring (LER), quadrupole pulsed magnets will be installed to enlarge the aborted beam, and in the HER, a pair of identical sextupole magnets is installed between the abort kickers and the extraction window. These sextrupole magnets are connected by I or 'I transformation to cancel the geometrical nonlinearity for the stored beam in the ring. This paper will report the optics design for the abort system of the HER as well as the observation of the aborted beam.
|
Paper |
download WEPIK007.PDF [2.290 MB / 3 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2017, Copenhagen, Denmark |
Series |
International Particle Accelerator Conference (8th) |
Proceedings |
Link to full IPAC2017 Proccedings |
Session |
Posters Wednesday 2 |
Date |
17-May-17 16:00–18:00 |
Main Classification |
01 Circular and Linear Colliders |
Sub Classification |
A02 Lepton Colliders |
Keywords |
sextupole, optics, injection, kicker, quadrupole |
Publisher |
JACoW, Geneva, Switzerland |
Editors |
Volker RW Schaa (GSI, Darmstadt, Germany); Gianluigi Arduini (CERN, Geneva, Switzerland); Juliana Pranke (ESS, Lund, Sweden); Mike Seidel (PSI, Villigen, Switzerland); Mats Lindroos (ESS, Lund, Sweden) |
ISBN |
978-3-95450-182-3 |
Published |
May 2017 |
Copyright |
|