Title |
Linac4: From Initial Design to Final Commissioning |
Authors |
- A.M. Lombardi
CERN, Geneva, Switzerland
|
Abstract |
This talk reviews the design, construction, and commissioning effort of CERN's new proton linear accelerator, Linac4, which has recently been commissioned and which is presently undergoing a reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shut down (LS2) and will then replace the ageing Linac2.
|
Paper |
download TUYA1.PDF [1.222 MB / 6 pages] |
Slides |
download TUYA1_TALK.PDF [30.159 MB] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2017, Copenhagen, Denmark |
Series |
International Particle Accelerator Conference (8th) |
Proceedings |
Link to full IPAC2017 Proccedings |
Session |
Invited Oral Presentations, Hadron Accelerators |
Date |
16-May-17 11:00–11:30 |
Main Classification |
04 Hadron Accelerators |
Sub Classification |
A08 Linear Accelerators |
Keywords |
linac, quadrupole, proton, emittance, DTL |
Publisher |
JACoW, Geneva, Switzerland |
Editors |
Volker RW Schaa (GSI, Darmstadt, Germany); Gianluigi Arduini (CERN, Geneva, Switzerland); Juliana Pranke (ESS, Lund, Sweden); Mike Seidel (PSI, Villigen, Switzerland); Mats Lindroos (ESS, Lund, Sweden) |
ISBN |
978-3-95450-182-3 |
Published |
May 2017 |
Copyright |
|