Title |
Linac4 PIMS Construction and First Operation |
Authors |
- R. Wegner, G. Favre, P. Françon, J.-M. Geisser, F. Gerigk, J.-M. Giguet, J. Hansen, J.-B. Lallement, A.M. Lombardi, S. Papadopoulos, M. Polini, M. Redondas Monteserin, T. Tardy, N. Thaus, M. Vretenar
CERN, Geneva, Switzerland
- W. Behr, M. Pap
Forschungszentrum Jülich GmbH, Central Institute of Engineering, Electronics and Analytics, Jülich, Germany
- G. Brzezinski, P. Krawczyk, L. Kujawinski, M. Marczenko
NCBJ, Świerk/Otwock, Poland
|
Abstract |
Linac4, CERN's new H⁻ injector Linac uses PI-Mode Structures (PIMS) for the energy range between 10³ and 160 MeV. 180 copper elements for 12 PIMS cavities have been fabricated in a collaboration between CERN, NCBJ and FZJ from 2011 to 2016. The cavities have been assembled, RF tuned and validated at CERN. This paper reports on the results as well as the experience with construction, installation, RF conditioning and first operation with beam.
|
Paper |
download THPIK094.PDF [1.669 MB / 4 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2017, Copenhagen, Denmark |
Series |
International Particle Accelerator Conference (8th) |
Proceedings |
Link to full IPAC2017 Proccedings |
Session |
Posters Thursday 2 |
Date |
18-May-17 16:00–18:00 |
Main Classification |
07 Accelerator Technology |
Sub Classification |
T06 Room Temperature RF |
Keywords |
cavity, linac, vacuum, alignment, operation |
Publisher |
JACoW, Geneva, Switzerland |
Editors |
Volker RW Schaa (GSI, Darmstadt, Germany); Gianluigi Arduini (CERN, Geneva, Switzerland); Juliana Pranke (ESS, Lund, Sweden); Mike Seidel (PSI, Villigen, Switzerland); Mats Lindroos (ESS, Lund, Sweden) |
ISBN |
978-3-95450-182-3 |
Published |
May 2017 |
Copyright |
|