Author: Zhang, J.
Paper Title Page
MOZB01 Construction and Beam Commissioning of CSNS Accelerators 47
 
  • S. Wang, S. Fu, J. Zhang
    IHEP, Beijing, People's Republic of China
 
  CSNS (China Spallation Neutron Source) is a proton accelerator based facility for delivering spallation neu-trons to users. The main components are 80-MeV linac, 1.6-GeV RCS and neutron production target. The con-struction began in 2011, and now construction of the building and accelerator components is well in progress. Most of the components have been tested and installed into the tunnel. The ion source and RFQ have been suc-cessfully commissioned. The first DTL tank has success-fully completed the beam commissioning, and the beam commissioning for the other three DTL tank will be per-formed before the end of 2016. The RCS commissioning will start in the beginning of 2017. This presentation provides a complete overview of the status of construc-tion and beam commissioning.  
slides icon Slides MOZB01 [11.853 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOZB01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)