Author: Wendt, M.
Paper Title Page
MOOCB01 PACMAN Project: A New Solution for the High-accuracy Alignment of Accelerator Components 58
 
  • H. Mainaud Durand, K. Artoos, M.C.L. Buzio, D. Caiazza, N. Catalán Lasheras, A. Cherif, I.P. Doytchinov, J.-F. Fuchs, A. Gaddi, N. Galindo Munoz, J. Gayde, S.W. Kamugasa, M. Modena, P. Novotny, S. Russenschuck, C. Sanz, G. Severino, D. Tshilumba, V. Vlachakis, M. Wendt, S. Zorzetti
    CERN, Geneva, Switzerland
 
  The beam alignment requirements for the next generation of lepton colliders have become increasingly challenging. As an example, the alignment requirements for the three major collider components of the CLIC linear collider are as follows. Before the first beam circulates, the Beam Position Monitors (BPM), Accelerating Structures (AS)and quadrupoles will have to be aligned up to 10 μm w.r.t. a straight line over 200 m long segments, along the 20 km of linacs. PACMAN is a study on Particle Accelerator Components' Metrology and Alignment to the Nanometre scale. It is an Innovative Doctoral Program, funded by the EU and hosted by CERN, providing high quality training to 10 Early Stage Researchers working towards a PhD thesis. The technical aim of the project is to improve the alignment accuracy of the CLIC components by developing new methods and tools addressing several steps of alignment simultaneously, to gain time and accuracy. The tools and methods developed will be validated on a test bench. This paper presents the technical systems to be integrated in the test bench, the results of the compatibility tests performed between these systems, as well as the final design of the PACMAN validation bench.  
slides icon Slides MOOCB01 [9.553 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOOCB01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPMB060 Upgrade of the LHC Schottky Monitor, Operational Experience and First Results 226
 
  • M. Betz, O.R. Jones, T. Lefèvre, M. Wendt
    CERN, Geneva, Switzerland
 
  The LHC Schottky system allows the measurement of beam parameters such as tune and chromaticity in an entirely non-invasive way by extracting information from the statistical fluctuations in the incoherent motion of particles. The system was commissioned in 2011 and provided satisfactory beam-parameter measurements during LHC run 1 for lead-ions. However, for protons its usability was substantially limited due to strong interfering signals originating from the coherent motion of the particle bunch. The system has recently been upgraded with optimized travelling-wave pick-ups and an improved 4.8~GHz microwave signal path, with the front-end and the triple down-mixing chain optimized to reduce coherent signals. Design and operational aspects for the complete system are shown and the results from measurements with LHC beams in Run II are presented and discussed.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPMB060  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPMR019 Beam Tests of a Prototype Stripline Beam Position Monitoring System for the Drive Beam of the CLIC Two-beam Module at CTF3 270
 
  • A. Benot-Morell, A. Faus-Golfe
    IFIC, Valencia, Spain
  • A. Benot-Morell, M. Wendt
    CERN, Geneva, Switzerland
  • A. Faus-Golfe
    LAL, Orsay, France
  • J.M. Nappa, S. Vilalte
    IN2P3-LAPP, Annecy-le-Vieux, France
 
  Funding: MINECO contract no. FPA2013-47883-C2-1-P. CLIC Collaboration Agreement, contract no. KE2638/BE. FNRA contract no. ANR-11-IDEX-0003-02.
In collaboration with LAPP and IFIC, two units of a prototype stripline Beam Position Monitor (BPM) for the CLIC Drive Beam (DB), and its associated readout electronics have been successfully installed and tested in the Two-Beam-Module (TBM) at the CLIC Test Facility 3 (CTF3) at CERN. This paper gives a short overview of the BPM system and presents the performance measured under different Drive Beam configurations.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPMR019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPOR008 Beam Induced RF Heating in LHC in 2015 602
 
  • B. Salvant, O. Aberle, M. Albert, R. Alemany-Fernandez, G. Arduini, J. Baechler, M.J. Barnes, P. Baudrenghien, O.E. Berrig, N. Biancacci, G. Bregliozzi, J.V. Campelo, F. Carra, F. Caspers, P. Chiggiato, A. Danisi, H.A. Day, M. Deile, D. Druzhkin, J.F. Esteban Müller, S. Jakobsen, J. Kuczerowski, A. Lechner, R. Losito, A. Masi, N. Minafra, E. Métral, A.A. Nosych, A. Perillo Marcone, D. Perini, S. Redaelli, F. Roncarolo, G. Rumolo, E.N. Shaposhnikova, J.A. Uythoven, C. Vollinger, A.J. Välimaa, N. Wang, M. Wendt, J. Wenninger, C. Zannini
    CERN, Geneva, Switzerland
  • M. Bozzo
    INFN Genova, Genova, Italy
  • J.F. Esteban Müller
    EPFL, Lausanne, Switzerland
  • N. Wang
    IHEP, Beijing, People's Republic of China
 
  Following the recurrent beam induced RF issues that perturbed LHC operation during LHC Run 1, a series of actions were put in place to minimize the risk that similar issues would occur in LHC Run 2: longitudinal impedance reduction campaign and/or improvement of cooling for equipment that were problematic or at the limit during Run 1, stringent constraints enforced on new equipment that would be installed in the machine, tests to control the bunch length and longitudinal distribution, additional monitoring of temperature, new monitoring tools and warning chains. This contribution reports the outcome of these actions, both successes as well as shortcomings, and details the lessons learnt for the future runs.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPOR008  