Author: Syratchev, I.
Paper Title Page
THPMW022 The RF Design of a Compact, High Power Pulse Compressor with a Flat Output Pulse 3591
SUPSS105   use link to see paper's listing under its alternate paper code  
 
  • P. Wang, H.B. Chen, J. Shi
    TUB, Beijing, People's Republic of China
  • I. Syratchev, W. Wuensch, H. Zha
    CERN, Geneva, Switzerland
 
  An X-band, high-power pulse compressor, which can produce a flat pulse and a power gain of 4.3, has been designed. The device is compact, with the dimensions of within 1m, and is designed for CLIC first energy stage based on klystrons. We also discuss about a two stage pulse compressor with power gain of 9.18, which may be a candidate of the X-FEL using CLIC X-band linacs and klystrons with low peak power.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPMW022  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOR031 Beam-Loading Effect on Breakdown Rate in High-Gradient Accelerating Structures 3848
 
  • F. Tecker, T. Argyropoulos, N. Catalán Lasheras, R. Corsini, A. Degiovanni, D. Gamba, J. Giner Navarro, A. Grudiev, G. McMonagle, J.L. Navarro Quirante, R. Rajamaki, E. Senes, I. Syratchev, B.J. Woolley, W. Wuensch
    CERN, Geneva, Switzerland
  • T. Argyropoulos, J. Giner Navarro
    IFIC, Valencia, Spain
  • A. Degiovanni, J.L. Navarro Quirante
    ADAM, Geneva, Switzerland
  • D. Gamba
    JAI, Oxford, United Kingdom
  • R. Rajamaki
    Aalto University, School of Science and Technology, Aalto, Finland
  • E. Senes
    Torino University, Torino, Italy
  • J. Tagg
    National Instruments Switzerland, Ennetbaden, Switzerland
 
  The Compact Linear Collider (CLIC) study for a future electron-positron collider with a center-of-mass energy up to 3 TeV aims for an accelerating gradient of 100 MV/m. The gradient is limited by RF breakdowns, and the luminosity requirements impose a limit on the admissible RF breakdown rate. RF testing of 12 GHz structure prototypes has shown that gradients in excess of 100 MV/m can be reached with the required breakdown rate. However at CLIC, the structures will be operated with significant beam-loading, modifying the field distribution inside. The effect of the beam-loading must be well understood but has not been previously measured. The commissioning and operation of an experiment to measure the effect of beam-loading on breakdown rate and the measurement results are presented.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOR031  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)