Author: Peterson, T.J.
Paper Title Page
WEPMR006 Transport of LCLS-II 1.3 GHz Cryomodule to SLAC 2268
 
  • M.W. McGee, T.T. Arkan, T.J. Peterson, Z. Tang
    Fermilab, Batavia, Illinois, USA
  • S.R. Boo, M. Carrasco
    SLAC, Menlo Park, California, USA
  • E. Daly, N.A. Huque
    JLab, Newport News, Virginia, USA
 
  Funding: Operated by Fermi Research Alliance, LLC, under Contract No. DE-AC02- 07CH11359 with the U.S. Department of Energy.
In a partnership with SLAC National Accelerator Laboratory (SLAC) and Jefferson Lab, Fermilab will assemble and test 17 of the 35 total 1.3 GHz cryomodules for the Linac Coherent Light Source II (LCLS-II) Project. These include a prototype built and delivered by each Lab. Another two 3.9 GHz cryomodules will be built, tested and transported by Fermilab to SLAC. Each assembly will be transported over-the-road from Fermilab or Jefferson Lab using specific routes to SLAC. The transport system consists of a base frame, isolation fixture and upper protective truss. The strongback cryomodule lifting fixture is described along with other supporting equipment used for both over-the-road transport and local (on-site) transport at Fermilab. Initially, analysis of fragile components and stability studies will be performed in order to assess the risk associated with over-the-road transport of a fully assembled cryomodule.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMR006  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)